![AUMA PF-M100 Series Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/auma/pf-m100-series/pf-m100-series_short-instructions_3016451004.webp)
2.
Cable connection
Cable arrangement
Cable arrangement depends on the number of cables connected in addition to the
mains cable. There are two options:
Figure 1: Cable arrangement
[1]
Cable arrangement for one mains cable and one fieldbus cable
[2]
Cable arrangement for a mains cable, a fieldbus cable and a signal cable
For better accessibility, we recommend heeding the following order.
1.
If a signal cable is connected in addition to the fieldbus cable: Insert signal cable
into cable gland on the right and push upward until the cable is visible.
2.
Insert fieldbus cables through middle cable gland and push upward until the
cable is visible.
3.
Insert mains cable into cable gland on the left and also push upward until the
cable is visible.
4.
Remove cable sheathing.
5.
Strip wires.
→
Controls approx. 6 mm, power supply unit approx. 10 mm
6.
For flexible cables: Use wire end sleeves according to DIN 46228.
4
Cable connection
Содержание PF-M100 Series
Страница 11: ...11...