Installation and Maintenance Manual
2. Verifying Package Contents
Version 1.0.21
17
Microsoft Teams
2
Verifying Package Contents
2.1
Mediant 800B/C
Ensure that your device package is shipped with the following items:
Four anti-slide bumpers for desktop installation
19-inch rack mounting kit (two flanges and six screws)
One AC power cable
(Optional) E1/T1 splitter cable adapter for T1 WAN interface (customer-ordered item)
USB dongle for DR-SBA software upgrade and recovery procedure (Teams image)
Microsoft Windows 2019 license (in envelope and label affixed to module)
(Optional) 1 x micro USB to USB cable adaptor 1.5m for serial connections (for
Mediant 800 without VGA connector in the rear panel)
Check, retain and process any documents. If any items are missing or damaged, please
contact your AudioCodes sales representative.
2.2
Mediant 1000B
Ensure that your Mediant 1000B DR-SBA package is shipped with the following items:
4 x Anti-slide bumpers for desktop installation
19-inch rack mounting kit (two flanges and six screws)
1 x micro-HDMI (Type D) to standard-HDMI (Type A) 1.5m cable adaptor for monitor
connections
1 x micro USB to USB cable adaptor 1.5m for serial connections
1 or 2 AC power cables (depending on customer order)
1 x USB dongle for SBA software upgrade and recovery procedure (Teams Image)
Microsoft Windows 2019 license (in envelope and label affixed to module)
Check, retain and process any documents. If any items are missing or damaged,
pleasecontact your AudioCodes sales representative.
2.3
Virtual Appliance
Ensure that you have downloaded the virtual disk file (VMDK) containing the DR-SBA image
for deploying on a virtual appliance on either VMware or HyperV platforms from the following
location:
Содержание Mediant 800B
Страница 2: ......
Страница 6: ...Installation and Maintenance Manual 6 LTRT 33443 Mediant SBA This page is intentionally left blank ...
Страница 15: ...Part I Hardware Description ...
Страница 16: ......
Страница 18: ...Installation and Maintenance Manual 18 LTRT 33443 Mediant SBA This page is intentionally left blank ...
Страница 24: ...Installation and Maintenance Manual 24 LTRT 33443 Mediant SBA This page is intentionally left blank ...
Страница 25: ...Part II Preparing SBA at Datacenter ...
Страница 26: ......
Страница 64: ...Installation and Maintenance Manual 64 LTRT 33443 Mediant SBA This page is intentionally left blank ...
Страница 66: ...Installation and Maintenance Manual 66 LTRT 33443 Mediant SBA This page is intentionally left blank ...
Страница 68: ...Installation and Maintenance Manual 68 LTRT 33443 Mediant SBA This page is intentionally left blank ...
Страница 96: ...Installation and Maintenance Manual 96 LTRT 33443 Mediant SBA This page is intentionally left blank ...
Страница 98: ...Installation and Maintenance Manual 98 LTRT 33443 Mediant SBA This page is intentionally left blank ...