V4.5
©2015-2019 AUBO.All rights reserved.
35
End-effector Installation
Mechanical structure size of end-effector flange
End-effector flange has four M6 threaded holes and a Ф6 positioning hole to fix the fixture on the end
easily, as shown in figure 6.8.
Figure 6-8 Mechanical dimensions of end-effector flange, unit: mm.
1.
Make sure the tool is properly and safely bolted in place.
2.
Make sure that the tool is constructed such that it cannot create a hazardous situation by
dropping a part unexpectedly.
Cable connection
There are 3 sockets on the bottom of the control box. There is a socket on the bottom of the robot body.
There is a socket on the lower right side of the teach pendant. Insert the corresponding cable into the socket
before use.
Table 3 Cable Connection Diagram
Classification
Photo
Содержание AUBO-i3
Страница 1: ...USER MANUAL AUBO i3 CB4 Please read this manual carefully before using the product...
Страница 2: ......
Страница 10: ...V4 5 2015 2019 AUBO All rights reserved vi...
Страница 26: ...V4 5 2015 2019 AUBO All rights reserved 22...
Страница 54: ...V4 5 2015 2019 AUBO All rights reserved 50...
Страница 85: ...V4 5 2015 2019 AUBO All rights reserved 81...
Страница 96: ...V4 5 2015 2019 AUBO All rights reserved 92 Figure 10 9 Position control base Figure 10 10 Position control end...
Страница 116: ...V4 5 2015 2019 AUBO All rights reserved 112 Date Time tab Figure 10 39 Date Time tab Date Time tab can set date and time...
Страница 125: ...V4 5 2015 2019 AUBO All rights reserved 121...
Страница 159: ...V4 5 2015 2019 AUBO All rights reserved 155 Figure 11 43 script file editor...
Страница 177: ......