background image

 

 

10 

 

 
 

Содержание AFSAD12

Страница 1: ...uctures under construction Protect installation materials from degrading air and flue exhaust systems Protect furnace electrical components from water Compartments must be closed when in operation Sho...

Страница 2: ...abinet Size Voltage Input Btu hr Gas Type Style Valve Model Rev S small SA small low amp D 12 VDC 12K 16K 18K 1 LP 1 Door 2 LD small vent 3 door w rear gas fitting 4 door w pigtail 5 door w pigtail re...

Страница 3: ...ing is given based on the installed position of the furnace Clearances Top Sides Rear Bottom to screw heads Blower side cabinet opening Vertical or Horizontal 1 2 1 2 1 2 0 16 sq in Spacing of 1 4 to...

Страница 4: ...s made at each register the total reading should not be less than what is shown in the table below for each BTU size If readings are below the table values airflow can be improved by adding ducts or b...

Страница 5: ...ap of the vent tube must be a minimum of 1 1 2 for proper function and exhausting of furnace 1 Locate were furnace will be installed and cut a hole opening as shown through the side wall where unit wi...

Страница 6: ...gs are treated with a sealing compound resistant to the action of propane LP gas DO NOT put sealing compound on flare fittings 3 Remove grommet plug from furnace After inserting gas line through gas p...

Страница 7: ...nace a burn off of excess oils remaining from manufacturing process may cause smoking or fumes for 5 10 minutes NOTE if furnace should lock out the blower will go off in 90 seconds and remain off unti...

Страница 8: ...WIRING AND LADDER DIAGRAM...

Страница 9: ...9...

Страница 10: ...10...

Страница 11: ...11...

Страница 12: ...12 Figure 1 Large Paddle Kit 31093 Figure 2 Small Paddle Kit 31094 Figure 3 Valve Kit 31098 Figure 4 Valve Kit 31096 Figure 5 Valve Kit 31097 Figure 6 Electrode Adjustment...

Страница 13: ...VERTISSEMENT Installation de cet appareil doit tre faite selon les instructions crites fournies dans ce manuel Aucun agent de repr sentant ou d employ Atwood ou toute autre personne n a le pouvoir de...

Страница 14: ...UES 19 BLOC D ALIMENTATION 19 DIMENSIONNEMENT DE CHEF D ORCHESTRE 19 INSTALLATION DE THERMOSTAT 19 MODE D EMPLOI 19 Fermer Unit 20 MOD LE DE NOMENCLATURE AF S D 20 1 1 1 A Four Atwood Taille de coffre...

Страница 15: ...les hauteurs libres indiqu es et doivent b n ficier de la pleine longueur et la largeur de l unit Espacement est donn bas sur la position de montage du four D gagements Retour au d but mm C t s mm Arr...

Страница 16: ...une l vation de temp rature tel que sp cifi sur la plaque signal tique Apr s que l installation du four et conduit du syst me est termin e pour obtenir une l vation de temp rature devrait ajust e Le...

Страница 17: ...rs De ventilation doivent maintenir chevauchements de 63 5mm po sur chappement tube et 12 7mm sur le tube d air NE d passez pas l paisseur maximale 6 Four s curis l tage avec pattes et vis vis de type...

Страница 18: ...la connexion du trou 5 4 standard conduit et registre rond standard Voir requis des conduits de section pour exigences Air de d charge de la persienne grill rond peut tre adress e 360 en tournant la p...

Страница 19: ...5 10 40 50 8 55 70 6 75 100 4 95 120 2 130 150 1 150 1 0 170 2 0 195 3 0 225 4 0 260 Ce radiateur est con u pour la masse n gative de 12 volts seulement N essayez pas de changer de four pour un syst m...

Страница 20: ...glage d sir Si la valeur au dessus de la temp rature ambiante ventilateur viendra 6 Permettre 30 secondes pour br leur principal s allume apr s que le souffleur s allume Ce four est quip d un disposi...

Отзывы: