ATWELL UMD-SRB01 Скачать руководство пользователя страница 28

27

UMD-SRB01 

Version 4

Definitions

For the scope of this documentation the following terms are clarified to 
have the described meanings.

Owner of the Lift

The natural or legal person who has the power of disposal of the lift and takes 
the responsibility for its intended operation and use.

Emergency

 

An abnormal situation in which persons require outside assistance.

Fault

A situation of operation in which safe operation of the lift for its intended use is 
restricted or impossible.

Installer

The natural or legal person who takes responsibility for the design, manufacture, 
installation and handover of the lift, including its safety components.

Maintenance Company

A company which is given responsibility for carrying out company maintenance 
operations, and which has competent persons at its disposal.

Maintenance Operations

All necessary operations (lubrication, inspections, cleaning, operations etc.) to 
ensure the correct and safe functioning of the lift after the completion of the 
installation.

Repair

Replacement or repair of defective and/or worn components.

Safety Components

Components which are defined as safety components in the EU Lifts Directive 
(2014/33/EU).

Competent Maintenance Person

Persons with the knowledge, technical ability and equipment able to perform  
the tasks allocated to them without danger.

Содержание UMD-SRB01

Страница 1: ...d Installation Manual Uncontrolled Movement Detector for Bi Directional Rope Brakes Installation Manual Version 4 0 Includes New Wiring Uncontrolled Movement Detector for Bi Directional Rope Brakes In...

Страница 2: ...11 General Advice 11 The Control Box UMD SRB01 11 Wiring 12 Mechanical Installation 18 Normal Operation 19 Resetting the System 19 Bypassing the System 20 Test Deployment of brakes 21 Uncontrolled Mo...

Страница 3: ...ed then the brakes under its control will be deployed and in addition to this an emergency stop signal will be sent to the main lift control panel by means of interrupting the main safety circuit Ther...

Страница 4: ...regular intervals The Competent Person must have had adequate training in theory and practice together with experience of the equipment in question to enable a true assessment of its condition for co...

Страница 5: ...us situations the installation shall be put out of service immediately We strongly advise that you should carry out a Risk Assessment to determine as completely as possible the different intervention...

Страница 6: ...the sensor assembly It will also monitor the status of the brakes It will perform a simple self diagnostic test to ensure all sensors are working if a fault develops a fault signal will be sent to the...

Страница 7: ...d so if there is a fault with it or the connection to it then an ALERT signal will be sent to the main lift panel This is to request the lift to be stopped at the next level open doors then render its...

Страница 8: ...ent rates one slow pulse for bypass mode and a quicker pulse for reset mode Signals Controller input power supply will be 230V or 110V AC 50 60Hz it has an internal 12v DC control voltage power supply...

Страница 9: ...set system and check wiring and brakes If all OK return to run mode None required Investigate reason Wait for engineer to reset system and check wiring and brakes If all OK return to run mode be retur...

Страница 10: ...connection to sensor and rectify problem If all OK return to run mode Wait for engineer to reset system after resetting the e stop button If all OK return to run mode Wait for engineer to reset syste...

Страница 11: ...en damaged or exposed to moisture they should not be used Please return them to Atwell International for examination and re test The brakes control boxes or sensors should never be lifted or carried b...

Страница 12: ...t is recommended that the Control box is ideally mounted at approx 1 5 metres high on to a solid wall adjacent to the main lift control panel and close to the rope brake and monitoring pulley position...

Страница 13: ...ld also comply with local regulations The 32 way connector is fitted so as to prevent the need for access inside of the control box If you should need access to the inside of the control box please co...

Страница 14: ...n withdrawn Within the UMD SRB01 enclosure the internal connecting cables are coloured orange this is so that you can easily identify them as potentially live check them and beware of them 2 Fuses Not...

Страница 15: ...d The control box input signals are 12V DC 100mA they require a dry volt free relay contact normally open and energised when the Car and Landing doors are closed In addition a connection directly to t...

Страница 16: ...pped around 8 core cable in case of future mods 8 core cable Cable screen sheathed and terminated to earth Black wire removed to show correct use of boot lace crimps Screened cable connected with main...

Страница 17: ...16 Atwell International Limited Wiring continued...

Страница 18: ...y ATWELL 8 Core screened cable Plug Supplied By ATWELL 8 Core screened cable Plug Supplied By ATWELL Please Note It is recommended that boot lace ferrules are used when connecting the 8 core cables to...

Страница 19: ...replacement unit if it was found to have failed under warranty Securely bolt the brackets supplied to the tapped holes provided in the rope brake side bars adjust backward or forward for slight tensi...

Страница 20: ...eck that there are no brakes displaying that they are already SET If they are already displaying set then check internal switches of the rope brake n Insert the key into the reset run bypass switch n...

Страница 21: ...that it cannot be left in this mode A LED indicator will also flash adjacent to the key switch If you are sure you need to bypass the movement detection then this is how it should be done n Check tha...

Страница 22: ...e Control Voltage LED is illuminated n Press the emergency stop button n The brakes will be immediately de energised and subsequently deployed n Check that both brakes SET LEDs have been extinguished...

Страница 23: ...the count as long as the door lock closes again before the count reaches 80 the rope brake will not be deployed Test 1 Slow speed creep away from the landing entrance 1 Check local operating condition...

Страница 24: ...s lit on the UMD SRB01 control panel 7 Hand wind the machine in the opposite direction of the engagement for approximately 25mm This will free the drop jaw from the ropes 8 Using the rope brake handle...

Страница 25: ...arts other than those specified or supplied by the supplier Atwell International should be used as incompatible parts may risk the safe operation of the lift Genuine spares are available within 24 hou...

Страница 26: ...ctor Assembly Monthly Check cleanliness of pulley clear any debris or of dust from assembly 6 Monthly Check all moving parts for free movement and wear Check rope alignment excessive wear Check bearin...

Страница 27: ...Sensor Pack complete with mounting plate Mounting Hardware Please Contact us for immediate despatch and compliant parts Electrical Supply Voltage 230V 10 Number of Phases Single Phase Neutral and Eart...

Страница 28: ...esign manufacture installation and handover of the lift including its safety components Maintenance Company A company which is given responsibility for carrying out company maintenance operations and...

Страница 29: ...ny attempt is made it will be logged and your warranty and any responsibility placed upon Atwell International will be immediately removed from ALL sites under your control there will be no exceptions...

Страница 30: ...64 1500 4 71 4713 300 0 94 943 1525 4 79 4792 325 1 02 1021 1550 4 87 4870 350 1 10 1100 1575 4 95 4949 375 1 18 1178 1600 5 03 5027 400 1 26 1257 1625 5 11 5106 425 1 34 1335 1650 5 18 5184 450 1 41...

Страница 31: ...oller Shoes Henning Load Weighing Equipment SASSI Machines Bedplates Machine Guarding Divertors Overspeed Governors Tension Weights Sliding Guide Shoes Guide Rails Buffers Compensation Chains Atwell I...

Отзывы: