background image

24

Chimney

Attachment of  the  appliance to  the  flue  must  be  always  done  with  approval  of  authorized chimney-
sweeping  company. There must always be sufficient draft in the flue and flue gas must be draught to the 
atmosphere in all possible operation conditions. For the right operation of the boiler the independent flue 
must be dimensioned in the right way, 

because combustion, output and service life of boiler depends 

on the  draught.

  The draught is influenced by the section of flue, height and roughness of the internal 

wall. Into the flue where the boiler is attached, no other appliance can be attached. 

The flue diameter 

must not be smaller than the outlet on the boiler. 

Flue draught must have the specified values. But it 

must not be too high so as not to decrease the efficiency of boiler and interrupt burning. If the draught is 
too strong, install a throttle valve between the flue and boiler.

Informative values  of flue section:

            

      For DP25, DP35, DP45                         DP75, DP95

                   20x20 cm        min. height 

7 m               Ø25 cm          min. 

height 9 m

                   

Ø20 cm           min. 

height 

8 m               Ø30 cm          min. 

height 7 m

                   15x15 cm        min. height 11 m             25x25 cm       min. height 8 m
                   

Ø16 cm           min. 

height 12 m    

 Flue draught is specified in technical parameters.

Exhaust  pipe

Exhaust pipe must have the outlet into the chimney. If the boiler can not be attached to the chimney 
directly, the exhaust pipe must be 

as short as possible and not longer than 1m 

without heating surface 

and it must rise to the flue. Exhaust pipes must be tight and resistant against flue gas leakage and cleanable 
from inside. Exhaust pipes must not come through home and utility spaces and the internal section of the 
exhaust pipe  must not be narrowing to the flue. Using  bents is not suitable.

Connecting the boiler to the mains net

The boiler is connected to the mains of 230 V, 50 Hz by a supply cord and plug. The voltage is of M type 
and when replaced, the same type must be used by a  service oragnization.The appliance must be located 
in such a way that the plug was within the reach of the attendance.
(according to STN EN 60 335-1 + A11:1997).

Installation of the  boiler to the heating system

The  ATTACK  DP  boiler  only  by  a  company  certified  for  the  installation  and  assembly  of  heating 
equipment.  Before  the  installation  there  must  be  a  project  responding  to  valid  regulations.  Before 
installing the boiler to the old heating system, the installing company must sluice out the whole system to 
clean it. The heating system must be filled by the water of quality according to   STN 07 7401:1991, 

2+

especially the hardness of water cannot be more than  1 mmol/l and the ia Ca   cannot be more that 0,3 
mmol/l. If these conditions are not kept, the warranty cannot be accepted. 

Boiler transport

Producer enables better manipulation with the boiler by the eyes welded on 
the exchanger. They ensure better clamping of chain or rope that can be used to 
place the boiler as it is required. Before beginning of transport, put down the 
upper  covers.  Place  the  boiler  by  using  of  eyes  and  rope  to  the  required 
location and put the upper covers back. To ensure safe manipulation with the 
boiler, it is necessary to leave appropriate space. For manipulation, use only 
devices that are technically in conformity with technical norms and control 
them in adequate way, not to threaten safety of the people. Special machineries 
have  to  be  attended  by  trained  staff.  Producer  takes  no  responsibility  for 
damages caused by incorrect manipulation and by breaking instructions given 
in this manual. Producer also takes no responsibility for bodily injuries caused 
by breaking safety instructions.

Содержание DP PROFI

Страница 1: ...W W W A T T A C K S K WOOD GASIFYING BOILER ATTACK DP STANDARD PROFI INSTRUCTIONS FOR USE ...

Страница 2: ......

Страница 3: ...theboileroutput During the mode with decreased output summer mode and water heating it is necessary to startburningdaily Fuel must be used only dried of 12 20 moisture content with a higher moisture content of fueltheoutputof boilerdecreasesanditsconsumptionincreases The choice of the right boiler size that is its heating output is a very important condition for economic operation and right functi...

Страница 4: ...Chimney exhaust pipe connecting boiler to the mains connection to the heating system 16 Protection of boiler against corrosion 17 Installation and change of the fireproof concrete shaped peaces 18 Variants of connections 19 Variants of connections variants of protection and boiler durability increase 20 Operation with the accumulation tanks 21 Protection of boiler against overheating 22 Possible f...

Страница 5: ...the right type and output of the boiler impeccable putting into operation sensitive attendance regular technical maintenance reliable service General description ATTACK DP wood gasifying boiler is designed for economic and ecological heating of family houses bungalows small plants workshops and similar objects Specified fuel for ATTACK DPboilers is dry wood e g logs of lengths depending on the typ...

Страница 6: ... 65 90 10 27 230 2 kW kW 2 m 3 dm mm Pa kPa kg mm mm mm mm IP W C kg s dB 1 kgh mm hod l l V Hz C C V A mm Type of boiler Boiler output STANDARDversion Output range PROFIversion Heating surface Feed hopper capacity Dimensions of feeding opening Prescribed chimney drought Max operating pressure of water Weight of boiler Diameter of the flue connection Boiler height A Boiler width B Boiler depth C T...

Страница 7: ...ing 7 Aftercooling circuit 8 Chimney 9 Suction fan 10 Outlet valve 11 C H return connection 12 C H flow connection 13 Primary air flap 14 Secondary air flap 15 Regulation door 16 Output regulator 17 Control electronics PROFI version 18 Pressure gauge ATTACK DP 25 45 ATTACK DP 75 ATTACK DP 95 DP25 35 DP45 95 G6 4 G2 G6 4 G2 Rising pipe E Return pipe F ...

Страница 8: ...ctionoftheboileragainstshort circuit 3 Mainswitch switchingonof theboiler switchingoff ifnecessary 4 Flue gas thermostat when the temperature of flue gas drops below the set up value the fan isswitchedoff 5 Boiler thermostat serves for setting up maximum temperature of water in the boiler after exceeding set up temperature the fan is switched off and the boiler works with minimum output After decr...

Страница 9: ...rt of attendance possibility of output regulation and possibility to connectcontrolandregulationelements Boiler temperature is kept at the level set at by user by means of control of the flue gas ventilator s rotations Boiler regulator of the ATTACK PROFI boilers performs permanent measuring of temperature of water in the boiler and indicates it on display Regulator controls rotations of the flue ...

Страница 10: ...dedandiftheterminalscrews arefittedwell ATTENTION Max total output of the appliances connected regulator must not exceed 450W ATTENTION For extended function of regulator it is possible to connect the UM 1 Module that enables control of additional boiler or C H pump Connection of additional appliancestomodule s contactshavetobeseparatedbyappropriaterelay Theunusedcontactsofthismodulecanstayunconne...

Страница 11: ...rts to work and the control process begins VentilatorisstoppedbytheSTOPbutton If the regulator is not in the operation mode temperature of water in the boiler is indicated on display Example 70 C STOPmode 70 C Operationmode 70 C Firekeepinginoperationmode Manualstartofventilator During the boiler operation might the user need to turn the fan on manually e g for suction of gas from boiler before an...

Страница 12: ...it is switched to the service mode where you can see and change programmed parameters Service mode is indicated by flickering of the additional thermostat s control light It is possible to browse parameters by the and buttons After selection of the required parameter you can switch into the mode for parameter change by pressing of the OK button this mode is indicated by flickering of the parameter...

Страница 13: ... the C H pump 1 99 1min 2 L 65 Minimum boiler temperature 60 65 1 C 65 H 90 Maximum boiler temperature 80 95 1 C 90 h 5 Hysteresis of boiler temperature 1 10 1 C 5 A 105 Temperature of boiler overheating 95 105 1 C 105 Fc 1 Testing method of fuel shortage 0 increase of temperature of water in the boiler 1 measuring of flue gas temperature 0 1 1 1 Fd 60 Time of measuring of fuel shortage during boi...

Страница 14: ...OPERATION mode Ventilatorpause Πu6 timebetweenoperationperiodsofthefan Operation time of the fan in the manual mode Πd 3 this parameter determines how long will the fan work when it was activated manually By setting of this parameter to is the optionofmanualfanoperationinactive Parametersofthe centralheating pump Temperature of the C H pump start P 65 temperature of water in boiler that causes sta...

Страница 15: ...ction fan is stopped also when the boiler thermostat sensor is damaged and this errorisdisplayedasmessage E1 Emergency thermostat regulator has also additional protection against overheating which is independent from processor In case of temperature increase to 95 C the control process is launched by ventilator stop and pump start Ventilator and pump are included into the control process again whe...

Страница 16: ...hat regulate ventilator and pump and the circuits that control next boiler By selection of outP on display and by pressing the OK button you can start the circuitingpump for a short time By selection of outΠ and pressing OK you can start the fan By selection of outr and pressing OK you can start the additional boiler system signalizing alarm or the servo motor of the mixing valve if thenextmodulei...

Страница 17: ... gas temperature is below desired temperature thiswillalsobesignalledwithquickblinkingofthermostatindicator Errormessages Boiler regulator permanently tests correct function of the internal systems and of the boiler temperature sensor When the error is detected regulator stops flue gas fan C H pump and at the same the appropriate error message is displayed In case of accident it is necessary to st...

Страница 18: ...17 Connection of module UM 1 Regulator Regulator Gas boiler electric boiler Alarm other devices ...

Страница 19: ...al fleece put under the covers of outside jacket In theupperpartoftheboilerthereisacontrolboardforelectromechanicalregulation In the rear part of the boiler there is a channel for inlet of primary and secondary air with a regulationflapwheretheairisheatedtoahightemperature Descriptionofthe STANDARD version Thermometerindicatesoutlettemperatureoftheboiler Ifitisnecessary theboilercanbeswitchedoffby...

Страница 20: ...ion of boiler protection against overheating Fasten the chain by bigger hook to mounted and complete regulator Set the temperature on regulator to 80 C for setting of temperature use the red scale Open the inlet flap to maximum by fastening it to the second end of the chain Heat the boiler up When the water temperature reaches 80 C after few minutes adjust the chain length to let the door open for...

Страница 21: ... position of the turning post purge time button in the rear part of the regulator During the set up there is always information on the display which lasts 2 seconds P1 P9 P In case you do not wish purging of gas in the boiler itisnecessarytosetup P To make the process of burning up the boiler stable there is a burning up system installed in the regulator After plugging in or stopping the alarm the...

Страница 22: ...ching the required temperature the control light switchces off the circuit pump of centralheatingswitchesoffandtheboilerstarts burningat thetemperatureof 65 C For the purposses of timing regulation by room temperature it is possible to connect any optional programmable thermostat with the terminals for the sensor of room temperature In thiscasetheturningbuttonof theroomthermostatis not working If ...

Страница 23: ...l situations and for the shortest time possible Afterheating season is finished clean the boiler thoroughly replace damaged parts Twice a year clean the moving wheel of the ventilatoranditsairchamber Changing the packing cordofthe door Dismantle the old packing cord with a screwdriver and clean the rabbet where it was placed Take the new packing cord and put its begining on the horizontal parts of...

Страница 24: ...hich are situated near the boiler have to be protected by non combustible board or fire screen if it is impossible to keep the safe distance If the boiler is located on the floor from combustible materials the flor must be covered with the non combustible thermal insulating pad exceeding the boiler planview at least 100mm on the side with feeding door and ash door All the solid materials of A degr...

Страница 25: ...table Connecting the boilertothemains net The boiler is connected to the mains of 230 V 50 Hz by a supply cord and plug The voltage is of M type and when replaced the same type must be used by a service oragnization The appliance must be located insuchaway thattheplugwas withinthereachoftheattendance accordingtoSTN EN60 335 1 A11 1997 Installation ofthe boilertothe heating system The ATTACK DP boi...

Страница 26: ...uggested by a designer due to specific conditions of the heating system Electric installation together with the proper equipment of the boiler must by done by a specialist in compliance with valid standards The basic version of boiler Standard doesnothaveathermostatfor pumpbuiltin Protectionofboileragainst corrosion Suitable solution to this problem is mixing appliance Regumat ATTACK OVENTROP whic...

Страница 27: ...5 only after the elimination of the gaskets Then insert the new jet eventually the cube and seal up with gasket backwardss If it is necessary change also the gaskets The jet is insertedregardingthesign on thelower partofthejetintotherear partoftheboiler Installation and exchangeof thefireproof concreteshaped peaces version2 Put the rear part pos 1 into the lower chamber the intagliated part backwa...

Страница 28: ...onnections The variant of connection with the regulating system REGUMAT ATTACK OVENTROP ATTACK DP boiler Expansion vessel The pump Regumat ATTACK OVENTROP Heating system Storage tank for DHW 1 2 4 3 Return flap Return Flap ...

Страница 29: ...the boiler to more than 65 C The return water temperature below 60 C causes increasing formation of condensate and the tar and then decreasing of boiler durability Technical parameters Clarity DN25 Max pressure 10 bar Max temperature 120 C Value kvs 3 9 Clarity DN32 Max pressure 10 bar Max temperature 110 C Value kvs 0 Regumat consists of three way mixing valve circulation pump closting cock therm...

Страница 30: ...the water in the accumulation tank to 90 100 C by full output in 2 4 feedings After next feeding the heat is taken from the accumulation tank only through the three way valve The offtake period depends on the tank volume and external temperature In heating season it can be 1 3 days if the prescribed min volume is respected If it is not possible to use the prescribed volume of the tank it is recomm...

Страница 31: ...ards and norms Liquidation of wrapping The wrapping has to be liquidated according to local standards and norms Protection of the boiler against overheating CAUTION Cooling circuit against overheating must not be used by STN EN 303 5 for other use than protection againstoverheating Valve on the cold water inlet to cooling circuit must be opened constantly and the heating circuit has to be connecte...

Страница 32: ...31 ...

Страница 33: ... 140 150 951 1000 1105 1218 1338 1467 1603 1748 1901 1980 2057 2217 2383 2557 2737 2924 3118 3318 3523 3722 3815 3901 4049 4153 Resistance kOhm 980 1030 1135 1247 1367 1495 1630 1772 1922 2000 2080 2245 2417 2597 2785 2980 3182 3392 3607 3817 3915 4008 4166 4280 1009 1059 1165 1277 1396 1523 1656 1797 1944 2020 2102 2272 2451 2637 2832 3035 3246 3466 3691 3912 4016 4114 4283 4407 MIN MAX ...

Страница 34: ...ondensator 1 Black wire 2 Blue wire 3 Brown wire 4 Yellow green wire 5 Red wire Pump Fan Earthing TC Pump thermostat KEY FOR DP BOILERS F 2A 250V 2 3 4 5 6 7 8 9 10 11 12 HV ST KT BT t C t C t C 2 3 4 1 2 2 1 2 1 1 SL HN SN HL 4 4 1 TČ 95 1 ST C ST 2 PE PT 1 PT C PE BT 1 BT C PE 1 1 TČ 95 1 1 4 230V 50Hz 1 t C TC 95 C KO 2 5 1 4 4 4 5 ATTACK DP STANDARd 25 75 ...

Страница 35: ...34 ATTACK DP STANDARD 95 ...

Страница 36: ...2 2 230V 50Hz L N N L N L HV Main switch ST Flue gas thermostat KT Boiler thermostat BT Safety thermostat KO Condensator 1 Black wire 2 Blue wire 3 Brown wire 4 Green yellow wire 5 Red wire Pump The fan Earthing TC Pump thermostat THE KEY FOR DP BOILERS ATTACK DP PROFI 25 75 ...

Страница 37: ...36 ATTACK DP PROFI 95 ...

Страница 38: ...r of operation Date Stamp signatureofserviceorganization Obligatory service examination after the 3 rd year of operation Date This page serves for confirming service examinations and is kept by a customer RECORD ON PUTTING THE BOILER TO OPERATION Dataonthecustomer llegible Productionnumber Nameandsurname Dateofputtingtooperation Serviceorganization Street Postcode town Stamp signature Tel No ...

Страница 39: ......

Страница 40: ...odukten ohne eine vorige Warnung Изготовитель АТТАСК оставляет за собой право изменения технических параметров и размеров котла без предыдующего предупреждения Le producteur ATTACK Sàrl réserve le droit des modifications techniques sans l avertissement précédent Productor ATTACK s r o reserva el derecho de cambios técnicos sin advertencia anterior ATTACK s r o Dielenská Kružná 5020 038 61 Vrútky S...

Отзывы: