ATS Water boy Скачать руководство пользователя страница 8

11/10/2008  

1000-102-930 

INST 

 

 

8

 

Figure 5 - Cutoff Switch Wire Splice 

37. Trim excess wire and enough loom to cover the switch wires. 

38. Use supplied butt connectors, solder and heat shrink to wire in switch.  

39. Fill the tank, check for leaks. 

40. Reconnect the battery(s). 

41. Test-drive the vehicle with the system armed.  The LED will be green 

when armed, yellow during stage 1, orange during stage 2, and red during 
stage 3. 

42. In a safe place, drive the vehicle such that EGT’s are produced to activate 

all three Water Boy stages.  Check for leaks, and adjust the EGT settings 
on the electronics box to tune performance.  

 

 
 

 

 

 
 

 

Cut and splice 
this red wire 

Содержание Water boy

Страница 1: ...drill bit to pe s before sta al along to t ter Boy is d e EGT It r with winds on Manual Boy Stag es and mo ructions be ater Boy Ki you will ne erform this arting If in them The designed fo is not to...

Страница 2: ...active The third stage will activate when the EGT probe senses a temperature above the box setting AND the boost sensor measures approximately 15 psi or 30 see Boost Level Setting section of boost or...

Страница 3: ...k that no other vehicle systems are damaged during installation Installation 1 Please make sure no parts are missing from ATS Stage 3 WaterBoy Kit A complete corresponding list of parts can be found o...

Страница 4: ...the switch with the spade connector Connect the other end of the black wire to a good ground under the dash 16 Connect the supplied Pink wire to the remaining switch terminal and attach it to a 12V s...

Страница 5: ...ebris holes in th ind that the good dista zzles Make assenger s pport Dura e pump to a y harness a y 1 Conne assembly a ware Relay 2 la battery Cu onvenient l Relay 1 la battery Cu onvenient l ires to...

Страница 6: ...onnecto m the T to ot have a s the 21 64 d ting before ctronics boa st line fitting 31 d intake ma Ford 6 0L m T tings on the lent size and po ds quire a boos oft 1 8 line ors then sp the boost p soft...

Страница 7: ...area so it is easy to check and clean in the future 35 Run 3 8 line from the filter to the tank 36 With the tank in place and 3 8 lines installed route the Red harness wires labeled To Tank along the...

Страница 8: ...nk check for leaks 40 Reconnect the battery s 41 Test drive the vehicle with the system armed The LED will be green when armed yellow during stage 1 orange during stage 2 and red during stage 3 42 In...

Страница 9: ...11 10 2008 1000 102 930 INST 9...

Страница 10: ...hat the wiring is correct Check the fuse that is inline with the relay s yellow wire Check the filter housing to see if it is clogged If so remove element rinse until clean and replace The system goes...

Страница 11: ...Body and ATS High Performance Transmission along with our full line of power enhancers Please call or e mail our Technical Service Department 8 00am to 5 30pm Mountain Standard Time Monday through Fri...

Страница 12: ...NPT Fitting A6MC6 MG 4 Self Tap Screw 85241D 1 Self Tap Screw 84930D 1 16 14 Ring Connector 35776 3 Reservoir Tank Assembly 1 Tank Cap 070316AE 1 3 8 Push In to 3 8 NPT Fitting A6MC6 MG 6 Washer 88445...

Страница 13: ...ng HSR316 1 ATM Fuse Holder ATMFH12 1 15A ATM Fuse ATM15 1 Switch 3 Female Blade Connectors 86061 4 18 AWG Wire Black GPT 18 00 4 18 AWG Wire Pink GPT 18 11 1 16 14 Ring Terminal 25262 13 Nozzle Bundl...

Отзывы: