ATS 2330 Series Скачать руководство пользователя страница 17

13

Test Type

Used to select what type of test to run. The “Timed Test” will run until a time period is finished. The “Indefinite 

Test” will run until the specimen breaks or the operator stops the test.

Unload at End of Test

This checkbox tells the system to unload the sample at the end of a test.

IP Address

Used to allow someone at a remote location to monitor the system using a VNC viewer program.

Current Time

Allows the operator to set the current time of the system. This time is used in any log files.

Start Delay

Used to allow the system to be set up to start the cycle automatically after a time delay. You can think of it like 

a “coffee timer”. Just enter the Hours and Minutes you wish to wait before start and press the yellow button. 

The button will light to show that a delay has been set. The delay button is a toggle switch, so to turn off a 

delay that has been started just press the button again. Note the status of the system will show “Delay Start” 

when it is active and the remaining time before start is shown.

Done Button

Will return you to the Main Screen. 

MAN - 

PLC

 Lever Arm Tester - REV: 01

 

| E. Software Overview

Figure E.9: View Screen

Содержание 2330 Series

Страница 1: ...REV 01 PLC Lever Arm Tester INSTRUCTION MANUAL This manual contains important operating and safety information Carefully read and understand the contents of this manual prior to the operation of this...

Страница 2: ...sent a commitment on the part of Applied Test Systems ATS Copyright Applied Test Systems 2019 For assistance with set up or operation contact the ATS service department Please have this manual and pro...

Страница 3: ...s 4 C 2 Equipment Parts 6 C 3 General Description 7 Product Specifications 7 D Installation 8 D 1 Unpack and Set Up 8 D 2 Lever Arm Assembly Installation 8 E Software Overview 10 E 1 Main Screen 10 Pr...

Страница 4: ...Done Button 13 F Operation 14 F 1 Basic Operation 14 F 2 Sample Break 15 G Maintenance 16 G 1 Knife Edges 16 G 2 V Blocks 16 G 3 General Maintenance 16 Appendix A Warranty 17 Appendix B Wiring Diagra...

Страница 5: ...als for inspection by the carrier A 2 After Sale Support If there are any questions concerning the operation of the unit or software contact the ATS service department at 1 724 283 1212 Before calling...

Страница 6: ...se instructions can result in permanent damage to the unit significant property damage personal injury or death All ATS equipment is designed to be operated with the highest level of safety To maintai...

Страница 7: ...ATS Service Department or your ATS Sales Engineer CAUTION Installation of electrical devices must be accomplished by competent personnel and done in accordance with any current local and national cod...

Страница 8: ...MAN PLC Lever Arm Tester REV 01 C System Overview 4 C System Overview C 1 Safety Label Locations Figure C 1 Safety Label Location Side...

Страница 9: ...MAN PLC Lever Arm Tester REV 01 C System Overview 5 Figure C 2 Safety Label Location Front...

Страница 10: ...Block 4 Safety Guard 5 Weight Pan Shackle 6 Roller Chain 7 Auto Leveling Actuator 8 Auto Leveling Sensor 9 Weight Pan 10 Isolator Pads 11 Shock Pad 12 Drawhead Assembly 13 Break Sensor 14 Break Actuat...

Страница 11: ...ide the contact fulcrum for the arm Knife edges are rotatable with four edges and are easily replaceable to maintain accuracy A variety of optional accessories are available to complete the system to...

Страница 12: ...t NOTE When moving the test frame use moving blankets between components and the material handling devices and follow accepted moving practices to avoid damage to the testing machine 5 Provide electri...

Страница 13: ...c Re check step a 8 Check position and operation of shutdown actuator a Install shutdown floating actuator in lever arm above proximity switch b Adjust nuts to provide 0 clearance over the switch wit...

Страница 14: ...ount of time that the system will run the test Unload Time Will only be displayed if Unload at end of test is selected It is the amount of time that the system will unload the specimen at the end of a...

Страница 15: ...they can not be changed at this point Near the top of the display is a status bar that will show the current state of the machine cycle Below are the different states in the order that they usually ru...

Страница 16: ...he lever arm drops all the way down indicating that a sample has broken If a sample breaks you have two choices You can remove the broken sample use the jog buttons to reconnect the load train and lev...

Страница 17: ...s time is used in any log files Start Delay Used to allow the system to be set up to start the cycle automatically after a time delay You can think of it like a coffee timer Just enter the Hours and M...

Страница 18: ...train 6 Adjust lower take up stud to level the lever arm when the load is applied 7 Using the jog buttons adjust the weight pan so that any weights loaded will sit on the weight pad Weight pan loadin...

Страница 19: ...sample breaks you have two options 1 Press the End Stop to abort the test where it is 2 Continue the test a Take the broken sample out of the load train b Reconnect the load train c Use the jog button...

Страница 20: ...rers literature for additional maintenance instructions CAUTION Do not overload the machine Observe rated capacity on data tag CAUTION Do not overload load train components Elevated temperatures lower...

Страница 21: ...product must be returned to the Applied Test Systems factory or an authorized repair center Applied Test Systems shall not be liable for any labor transportation or installation costs that may arise...

Страница 22: ...AWN BY DATE ENGINEER JOB NO DWG NO CAD DWG FILE REV SHEET NO 4 3 2 0 11 07 2018 18 17892 U Eng Drawing Files 2 XXXX 2 95XX 2 9546 R0 S1 DWG BLU_ 16AWG RED_ 16AWG GRN_YEL_ 16AWG BLK_ 16AWG BRN_ 16AWG B...

Страница 23: ...Y DATE ENGINEER JOB NO DWG NO CAD DWG FILE REV SHEET NO 4 3 2 0 11 07 2018 18 17892 U Eng Drawing Files 2 xxxx 2 95xx 2 9546 R0 S2 DWG JUMPERBAR DB9S PIN 1 DB9S PIN 2 WHT_ 20AWG RED_ 20AWG JUMPERBAR J...

Страница 24: ...C 3 Basic Lever Arm Front 6 Figure D 1 Lever Arm Assembly Dual Ratio Shown 9 Figure E 1 Main Screen 10 Figure E 2 Main Screen Cycle State 10 Figure E 3 Off State Status Bar 11 Figure E 4 Running Stat...

Отзывы: