![ATS 2330 Series Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/ats/2330-series/2330-series_instruction-manual_3005256014.webp)
MAN -
PLC
Lever Arm Tester - REV: 01
| E. Software Overview
10
E. Software Overview
E.1 Main Screen
Figure E.1 below shows the Main Screen. This is shown when the
PLC
Lever Arm is started. It allows you
to setup and run machine cycles.
Process Time
Will only be displayed if a timed test type is selected. It is the amount of time that the system will run the test.
Unload Time
Will only be displayed if “Unload at end of test” is selected. It is the amount of time that the system will unload
the specimen at the end of a test.
Start Button
Used to tell the system that parts are loaded, to start the machine cycle.
View Button
Used to get to additional Set-up for the system.
Figure E.2 shows what the Main Screen looks like when the system is in Run Cycle State. Note the
Figure E.1: Main Screen
Figure E.2: Main Screen, Cycle State