 Lever Arm Tester- REV: 01 | D. Installation

8

D. Installation

D.1 Unpack and Set Up

1. Carefully remove the shipping crate and packing materials from the tester. Do not discard the packing

materials until all items on the invoice have been accounted for.

2. Use an overhead crane or forklift to remove the test frame and control console from the pallet and position

it in the desired location.

3. Position the test frame and control console to allow ample room for maintenance.

4. Adjust the Isolator Pads on the test frame to approximately level and to provide even support. Verify that

the frame is level by using a level front to back and side to side. Also check the upper crosshead.

CAUTION:

 Do not allow the isolator mount pads to slide on the floor while moving the 

tester. They are not designed to accept slide loading. Damage to the pads may result.

NOTE:

 When moving the test frame, use moving blankets between components and the 

material handling devices and follow accepted moving practices to avoid damage to the 

testing machine.

5. Provide electric power from a grounded source. This may be by use of a grounded line cord or by hard

wiring the tester. Follow the National Electric Code requirements and any other local codes in effect. Be sure

the voltage is correct.

CAUTION: 

Before energizing the electrical power to the testing machine, turn off all power 

switches and place all controls in an off or neutral position.

D.2 Lever Arm Assembly Installation

1. Position the knife-edge support block assembly to the top of the test frame. Align the match marks and

install the locating dowels.

2. Install bolts and tighten.

CAUTION: 

Match the serial numbers on the test frames with the support blocks and lever 

arms when assembling multiple testers.

3. Remove or pivot the lever arm safety guards to the side.

4. Check that the knife-edge and V-block mating surfaces are free of dirt, corrosion, or other debris.

Содержание 2330 Series

Страница 1: ...REV 01 PLC Lever Arm Tester INSTRUCTION MANUAL This manual contains important operating and safety information Carefully read and understand the contents of this manual prior to the operation of this...

Страница 2: ...sent a commitment on the part of Applied Test Systems ATS Copyright Applied Test Systems 2019 For assistance with set up or operation contact the ATS service department Please have this manual and pro...

Страница 3: ...s 4 C 2 Equipment Parts 6 C 3 General Description 7 Product Specifications 7 D Installation 8 D 1 Unpack and Set Up 8 D 2 Lever Arm Assembly Installation 8 E Software Overview 10 E 1 Main Screen 10 Pr...

Страница 4: ...Done Button 13 F Operation 14 F 1 Basic Operation 14 F 2 Sample Break 15 G Maintenance 16 G 1 Knife Edges 16 G 2 V Blocks 16 G 3 General Maintenance 16 Appendix A Warranty 17 Appendix B Wiring Diagra...

Страница 5: ...als for inspection by the carrier A 2 After Sale Support If there are any questions concerning the operation of the unit or software contact the ATS service department at 1 724 283 1212 Before calling...

Страница 6: ...se instructions can result in permanent damage to the unit significant property damage personal injury or death All ATS equipment is designed to be operated with the highest level of safety To maintai...

Страница 7: ...ATS Service Department or your ATS Sales Engineer CAUTION Installation of electrical devices must be accomplished by competent personnel and done in accordance with any current local and national cod...

Страница 8: ...MAN PLC Lever Arm Tester REV 01 C System Overview 4 C System Overview C 1 Safety Label Locations Figure C 1 Safety Label Location Side...

Страница 9: ...MAN PLC Lever Arm Tester REV 01 C System Overview 5 Figure C 2 Safety Label Location Front...

Страница 10: ...Block 4 Safety Guard 5 Weight Pan Shackle 6 Roller Chain 7 Auto Leveling Actuator 8 Auto Leveling Sensor 9 Weight Pan 10 Isolator Pads 11 Shock Pad 12 Drawhead Assembly 13 Break Sensor 14 Break Actuat...

Страница 11: ...ide the contact fulcrum for the arm Knife edges are rotatable with four edges and are easily replaceable to maintain accuracy A variety of optional accessories are available to complete the system to...

Страница 12: ...t NOTE When moving the test frame use moving blankets between components and the material handling devices and follow accepted moving practices to avoid damage to the testing machine 5 Provide electri...

Страница 13: ...c Re check step a 8 Check position and operation of shutdown actuator a Install shutdown floating actuator in lever arm above proximity switch b Adjust nuts to provide 0 clearance over the switch wit...

Страница 14: ...ount of time that the system will run the test Unload Time Will only be displayed if Unload at end of test is selected It is the amount of time that the system will unload the specimen at the end of a...

Страница 15: ...they can not be changed at this point Near the top of the display is a status bar that will show the current state of the machine cycle Below are the different states in the order that they usually ru...

Страница 16: ...he lever arm drops all the way down indicating that a sample has broken If a sample breaks you have two choices You can remove the broken sample use the jog buttons to reconnect the load train and lev...

Страница 17: ...s time is used in any log files Start Delay Used to allow the system to be set up to start the cycle automatically after a time delay You can think of it like a coffee timer Just enter the Hours and M...

Страница 18: ...train 6 Adjust lower take up stud to level the lever arm when the load is applied 7 Using the jog buttons adjust the weight pan so that any weights loaded will sit on the weight pad Weight pan loadin...

Страница 19: ...sample breaks you have two options 1 Press the End Stop to abort the test where it is 2 Continue the test a Take the broken sample out of the load train b Reconnect the load train c Use the jog button...

Страница 20: ...rers literature for additional maintenance instructions CAUTION Do not overload the machine Observe rated capacity on data tag CAUTION Do not overload load train components Elevated temperatures lower...

Страница 21: ...product must be returned to the Applied Test Systems factory or an authorized repair center Applied Test Systems shall not be liable for any labor transportation or installation costs that may arise...

Страница 22: ...AWN BY DATE ENGINEER JOB NO DWG NO CAD DWG FILE REV SHEET NO 4 3 2 0 11 07 2018 18 17892 U Eng Drawing Files 2 XXXX 2 95XX 2 9546 R0 S1 DWG BLU_ 16AWG RED_ 16AWG GRN_YEL_ 16AWG BLK_ 16AWG BRN_ 16AWG B...

Страница 23: ...Y DATE ENGINEER JOB NO DWG NO CAD DWG FILE REV SHEET NO 4 3 2 0 11 07 2018 18 17892 U Eng Drawing Files 2 xxxx 2 95xx 2 9546 R0 S2 DWG JUMPERBAR DB9S PIN 1 DB9S PIN 2 WHT_ 20AWG RED_ 20AWG JUMPERBAR J...

Страница 24: ...C 3 Basic Lever Arm Front 6 Figure D 1 Lever Arm Assembly Dual Ratio Shown 9 Figure E 1 Main Screen 10 Figure E 2 Main Screen Cycle State 10 Figure E 3 Off State Status Bar 11 Figure E 4 Running Stat...

Отзывы: