17
In Picture 10 are showed:
•
the handles with which the battery and the BMS (2 front handles shown by the red arrows) are equipped,
•
the screws that keep it together with the structure (2 screws shown by the red circles),
•
the screws that create the equipotential bond on earth (1 screw shown by a blue circle).
Picture 10
–
Wiring of the battery modules US2000B
ATTENTION
The handling of each battery must be executed by two people.
Wiring and fixing accessories to be removed:
•
for each battery module unscrew the 2 screws that keep it together with the chassis and the screw for the
equipotential bond;
•
disconnect all wiring related to data signals;
•
remove the red and black patch cords that connect the battery modules;
•
remove the battery from its slot by using the frontal handles;
•
remove completely the battery from its slot and put it on the floor.
Danger of explosion!
The battery modules inside the storage system may explode if:
▪
Exposed directly to sources of heat or open flame
▪
Do not expose the battery modules to direct sources of heat or open
flames.