
- 25 -
Once all the above operations are complete, you will
have returned the light tower to the same state as it
was before the positioning procedure (see figure
above). At this point the light tower is correctly
arranged for transport.
3.2.4
Towing
Before commencing towing, ensure you follow the
procedure below:
1. Check that the coupler (1) of the undercarriage of
the light tower is safely coupled to the towing
hook of the towing vehicle.
2. Connect the cabling plug to the towing vehicle so
that the rear lights of the light tower work
(indicators, lights, brake lights).
3. Check that the pressure and condition of the tires
are suitable for the road and the climatic
conditions.
4. Release the handbrake (2), if provided.
Do not proceed with towing if you
notice any broken or faulty parts.
Drive carefully according to the
road and climatic conditions.
1
2
Keep in mind that for the low speed
off-road non-homologated trailer,
the maximum speed is 20 Km/h!
00_00_HiLight H6+_EN.book Page 25 Friday, June 4, 2021 11:52 AM
Содержание HiLight H6+ DC
Страница 2: ...00_00_HiLight H6 _EN book Page 2 Friday June 4 2021 11 52 AM ...
Страница 93: ... 93 10 6 Dimensions ON ROAD UNDERCARRIAGE LED 00_00_HiLight H6 _EN book Page 93 Friday June 4 2021 11 52 AM ...
Страница 94: ... 94 ON ROAD UNDERCARRIAGE LED 00_00_HiLight H6 _EN book Page 94 Friday June 4 2021 11 52 AM ...
Страница 96: ... 96 00_00_HiLight H6 _EN book Page 96 Friday June 4 2021 11 52 AM ...
Страница 97: ... 97 Circuit diagrams 00_00_HiLight H6 _EN book Page 97 Friday June 4 2021 11 52 AM ...
Страница 112: ... 112 00_00_HiLight H6 _EN book Page 112 Friday June 4 2021 11 52 AM ...
Страница 115: ...00_00_HiLight H6 _EN book Page 115 Friday June 4 2021 11 52 AM ...
Страница 116: ...Printed in Spain www atlascopco com 00_00_HiLight H6 _EN book Page 116 Friday June 4 2021 11 52 AM ...