Manual,Robotic Tool Changer, QC‑310
Document #9620‑20‑B‑310 Series Base Tool Changer‑27
Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 •
B-11
2.5 Tool Plate Installation
Tools required: 8 mm, 10 mm, or 12 mm hex key, toque wrench
Supplies required: Clean rag, Loctite 242
1. Clean the mounting surfaces..
2.
If required, install the tool interface plate to the customer tooling, align using the boss or dowel pins and
secure with customer supplied fasteners.
3.
Align the dowel pins to the corresponding holes in the Tool plate and secure the Tool plate to the tool
interface plate or customer tooling with customer supplied fasteners.
4.
For first time installation of fasteners with pre‑applied adhesive no additional Loctite is required. If
fasteners are being reused, apply Loctite to threads (see
for fastener specifications).
NOTICE:
If an ATI interface plate is used, fasteners to mount the Tool plate is supplied with the
interface plate.
5. Connect utilities to the appropriate module and Tool plate connections.
6.
Safely resume normal operation.
Figure 2.2—Standard Tool Plate Installation
Tool Plate
Dowel Pins (Customer Supplied)
Tool Stand/Tool Interface Plate
(Customer Supplied)
(if required)
M10-1.5 Socket Head Cap Screws
(See Table 2.1)
(Customer Supplied)
2.6 Tool Plate Removal
Tools required: 8 mm, 10 mm, or 12 mm hex key
1. Place the Tool in a secure location.
2. Uncouple the Master and Tool plates.
3.
Turn off and de‑energize all energized circuits (e.g. electrical, air, water, etc.).
4. Disconnect all utilities (e.g. electrical, air, water, etc.).
5. Remove the socket head cap screws connecting the Tool plate to the tooling or tool interface plate.