Q45H Training Handout 4.05 

Page 6 of 11

 

ref 

ENTER 

Wait, X.XXX ppm 

“Wait” flashes 

Wait until display reads 

Adjust value 

If the “wait” does not stop flashing 
press ENTER 

Adjust Cl2 value using left arrow to 
select digit and to 

 adjust 

 

 

Press ENTER 

PASS, slp = XXX% 

After around 5 seconds display goes 
back to main display 

 

 

Using the colorimeter or Palin test v calibration of the ATi chlorine monitor 
 

Dpd test kits should be used with a level of ‘flexibility’ when comparing with continuous chlorine monitors. 
Error with the dpd tests are +/- 0.1ppm. This means that if you read 0.2ppm on a dpd test kit, it could be 0.3 
or 0.1ppm. Please do not change the ATi monitor if the difference is +/- 0.1ppm unless you take 3 tests and 
average them out. Even then, if you see large differences between the 3 results, make a decision on whether to 
change the reading or leave it be. See Palin test chart at end of this handout.

 

 

Helpful tips! 
 
Stablization by using the raw signal (nA signal found in MEASURE menu) 

Before you calibrate a brand new system, you have to wait for polarization. This can only occur with power going to 
the sensor. The sensor has to be in water to prevent the membrane ‘drying out’. Using chlorinated water (either in 
the flow cell or in a beaker) will speed up polarization. You will know when the sensor is polarized when the nA 
figure (in measure) stabilizes. Once this happens (could take > 6 hours unless you use a ready made sensor on a 
polorizer) take a dpd test and calibrate. 1ppm is roughly 150nA (with a 100% slope). Premature calibration will lead 
to an incorrect calibration and an in-accurate slope that will lead to future problems. A de-polorized sensor will give 
-26nA. As it polorizes, it will start to increase. 
 

Outputs and Relays (set up in CONFIGURATION and  program in CONTROL menu) 

There are 2 x 4-20mA outputs and 2 x relays (can be configured for alarm, control or fail). Initial set up in 
CONFIGURATION and  then program in CONTROL menu. The ribbon cable holds the outputs and relays. If you 
lose these, it will be because the ribbon cable has come loose. The fix is to power down the unit, disconnect the 
ribbon cable, re-connect the ribbon cable and power up. You will then get these back! 
 

DO NOT WIPE OR CLEAN THE MEMBRANE! Even with gunk and/or manganese on the sensor 

The sensitivity slope of the membrane will change only when you perform a calibration. The slope can be anywhere 
between 25 and 600%. If you calibrate up the slope comes down and vica versa. By wiping the sensor end, you are 
in theory, cancelling out previous calibrations. Leave the sensor until the unit fails a calibration (slope too high or 
slope too  low). 

 

Clean the pH probe bulb with white vinegar to make it sparkle! 

If the pH sensor is dirty and is out of calibration. Prior to calibrating wipe with a tough tissue and white vinegar.  
 

If the flow or power stops for a number of hours/days, what to check? 

If the flow or power has stopped for > 2 days, simply turn it back on and wait 15 minutes. Check for stabilization of 
the raw signal (nA in MEASURE as above) It will more than likely go to the correct figure, however, please check 
calibration. If the water or power has been off for 2+ days, best to rebuild sensor and then re-calibrate after 
stabilization.  
 
 

pH calibration is different to that of my portable? Why? 

Initial calibration of the pH probe (if used) is done by using pH buffers (usually 4 & 7) but can be anything you 
want. Make sure the buffer is in date and not open and old. An incorrect pH buffer will lead to problems with the pH 
and may also create problems with chlorine if correction is turned on. 
After initial 2 point pH calibration, you should not need to do this again. However, a 1 point calibration will be 
required to maintain correct pH readings. The 1 point pH cal should be completed after an hour of the 2 point cal to 

Содержание Q45H/62

Страница 1: ...ee Chlorine Measurement System Training Handout European Office Analytical Technology Unit 1 2 Gatehead Business Park Delph New Road Delph Saddleworth OL3 5DE Tel 01457 873 318 Fax 01457 874 468 Email...

Страница 2: ...the escape key aborts all changes to the current screen and backs the user out one level in the software tree The manual will refer to this key as either MENU or ESC depending upon its particular fun...

Страница 3: ...ssion is all that is needed Do not use tools to tighten The membrane should be flat across the bottom of the chamber without wrinkles 5 Fill the chamber with electrolyte until the level reaches the bo...

Страница 4: ...in 15 minutes 1 If the sensor requires zeroing simply go to the MEASURE mode press the UP arrow until it reads zero n A 2 Now disconnect the chlorine sensor and watch the readings drop to zero leave f...

Страница 5: ...nd press ENTER AT THIS POINT CARRY OUT THE DPD TEST AND WAIT FOR AT LEAST 20 SECONDS PER DPD TABLET AND CARRY OUT 2 TO 3 TO GET THE CORRECT AVERAGE 4 The system now begins acquiring data for the calib...

Страница 6: ...r calibration this minimum is required due to potential error of dpd test pH Calibration Must do first Keys to Press Screen Display User Action Required 1 MENU ESC until CAL MENU 2 ENTER Cal Cl2 3 Cal...

Страница 7: ...CONFIGURATION and program in CONTROL menu There are 2 x 4 20mA outputs and 2 x relays can be configured for alarm control or fail Initial set up in CONFIGURATION and then program in CONTROL menu The...

Страница 8: ...and check that the o rings are in place and are not broken If after time this happens again it may be due to micro cavitation created by the pump you are using drawing the electrolyte out of the memb...

Страница 9: ...d The difference between the very experienced and less experienced user is that the experienced user would calibrate the colorimeter prior to calibration take 3 tests and average them out The less exp...

Страница 10: ...the fill screw from the side of the sensor body 2 Remove the front nut from the bottom of the chamber and discard the protective membrane O rings are contained in grooves on both the bottom and top o...

Страница 11: ...Q45H Training Handout Page 10 of 11 Q45H 62 OPERATIONAL LOG PRINT OFF AND USE Date Q45H pH Value Portable pH Value Q45H CL2 Value DPD CL2 Value Pre Cal Slope Post Cal Slope Maintenance...

Отзывы: