® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014
76
Visual checking (VBG14/BGR500)
Manufacturer & Type
Serial n°:
Initial operation
on:
Regular checking
on:
Check-over
on:
Test step:
O.K.
Deficiency
Check-
over
Note
Type label
Capacity- and type label
Short user´s manual
User´s manual
Warning symbols
Marking for operation
Construction (deformation, cracks)
Torque of anchors and stability
Condition concrete floor (cracks)
Condition electrical lines
Lockable main switch
Condition/Function of safety notches
Condition/ Locking of screws, bolts and
bearings
Condition of lifting arms and pads
Condition/Function of lifting arm locking
Condition/Function of feet protector or CE-Stop
Function test limit switch above
Condition of lifting cylinder and chain
Condition/Function of hydraulic system
Condition/Function synchronization control
Condition of covers
Function test under load
Control and tighten of anchor torque (after 5
liftings under load)
General condition
Inspection plate granted
Result of test:
Further operation critical, check-over necessary
Further operation possible, remedy of deficiencies
No deficiencies, further operation granted
Name and stamp of service technician
Date and signature of service technician
Name and stamp of operator
Date and signature of operator
The operator confirms with his signature that the floor meets the requirements.