
® Urheberrecht ATH-Heinl GmbH & CO.KG, Alle Rechte vorbehalten / Druckfehler und technische Änderungen vorbehalten / Stand: 2022-06
Produkthersteller ATH-Heinl GmbH & CO.KG
- 40 -
Installing the limit switches
Installation of the CE Stop switch
•
Raise the lifting platform to a height of 380mm.
•
Mount the CE stop switch on the main column and check that it can be operated from the
underside of the crossbar.
•
Run the full cycle of lowering and raising to verify proper installation and ensure that the
alarm is heard during the final lowering phase. If necessary, adjust the switch by changing
the position of the switch lever.
•