® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2021-11
Manufacturer ATH-Heinl GmbH & CO.KG
- 25 -
4.
Electrical connection
a.
Lay all electrical cables between the control box and the lifting platform and connect
according to the numbering or plugs.
b.
The limit switches of the lifting platform are only connected electrically in this step, please
do not mount them on the platform until later.
Pay attention to the necessary supply line (see technical data).
The corresponding circuit diagram can be found in Appendix 6.2 of these operating instructions.
5.
Bleeding of the hydraulic circuit
See the instructions in the
Final work
chapter.
Before the system is put into operation or operated with oil for the first
time, the following must be observed in relation to the optimal, trouble-
free as well as almost air-free function.
a.
Use specified hydraulic oil (see technical data).
b. Are all hydraulic lines connected and tightened according to the hydraulic plan, if necessary
according to the hose designation?
c. A minimum oil quantity of 20 liters is necessary! Attention at the first filling!
6.
FEEDING OIL AND BLEEDING RUNWAYS
Do not install the top limit switch before bleeding the hydraulic line.
During this procedure, DO NOT attempt to raise lift with any load.