® Copyright ATH-Heinl GmbH & Co. KG, 2018, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014
16
Concrete quality:
C20/25
Concrete curing time:
Min. 20 days
If soils do not comply with the requirements, there can evoke serious injuries to personal or damages to the lift.
Do not install the lift on asphalt or soft concrete floor .
There must be no expansion joints or cuts on the floor which will break the continuity of the upper reinforcement.
The load capacity of intermediate ceilings must be checked by the operator
.
Place of installation
Safety zone
Min. 1 m
Admitted working temperature:
10-40 °C
Max. admitted humidity:
≤80% bei 30 °C
Height above the sea level:
≤2000m
Power connection & ground cable (see technical data) is to be made in form of a plug device (socket and plug) or a fixed
connection.
Necessary supply lines
See technical data
The lift is designed for an installation in dry rooms. The installation in
wet
rooms as well as in rooms
with a risk of
explosion
is
not allowed
. Furthermore the installation
outside
is
not allowed
.