Concrete quality:
C20/25
Concrete drying time:
Min. 20 Days
If soils do not comply with the requirements, there can evoke serious injuries to personal or damages to the lift.
Do not install the lift on asphalt or soft concrete floor.
There must be no expansion joints or cuts, which will break the continuity of the upper reinforcement.
Load capacity of intermediate ceilings must be checked by operator.