II. Packaging list

No.

1

2

3

4

5

6

Items

charging equipment

User manual

Certificate of quality

Mounting bracket

User card

Hex  head  expansion  bolt,
M8*80/304 stainless steel

Qty

1

1

1

1

3

9

Remark

Already installed on the rear side of the 
charging equipment

III. Installation and wiring

1

keep a minimum clearance of 1.2m all around the charger, as follows:

2

  The  charger  must  be  installed  on  a  customized  concrete  foundation,  the 

foundation is as below: 

Annotation:
1.The  foundation  pile  must  be  tamped.  On  loose  and  moist  soil,  the  foundation 
must 
be reinforced. The foundation must sit at the highest point of the area to avoid 
flooding water. 
2.The foundation pile is to be made of reinforced concrete, which requires for a 
minimum allowable bearing pressure of 1000kg/squire meters for the base. 
3.Construct main grounding busbar and electrode following the grounding 
regulation of transformer substation. Grounding resistance should be lower 
than4Ω, 50x4 galvanized flat steel is suggested. 
4.Cable conduit uses PVG of 150mm diameter, the direction should be determined 
according  to  the  situation  on  site,  while  the  quantity  is  according  to  how  many 
HV/LV 
cables will be used(use redundant design) . 
5.Level bar should be used to level the foundation ground. 
6.Internal foundation level should slightly lean towards water 

collecting pit.

7.The figure is just for reference. 

3.1  Installation conditions

Concrete foundation diagram

Содержание EVD-60D

Страница 1: ...t user manual 86 755 2998 8492 T Shenzhen Atess Power Technology Co Ltd 3rd floor building 9 Henglong industrial park the fourth industrial zone of Shuitian community Baoan district Shenzhen China E i...

Страница 2: ...ly for electric vehicles which has a friendly man machine interface and integrates corresponding functions of control billing communication and security protection The charging equipment uses OCPP 1 6...

Страница 3: ...stem Parameters 4 2 Network parameters 4 3 Protection parameters V Operation instruction and LCD introduction 5 1 Charging mode and operation 5 2 LCD interface introduction 5 3 Appendix Fault code VI...

Страница 4: ...erson can operate the breaker in the surge protection circuit and replace the lightning protection module The red circle in the figure is the lightning protection status indicator When the indication...

Страница 5: ...area to avoid flooding water 2 The foundation pile is to be made of reinforced concrete which requires for a minimum allowable bearing pressure of 1000kg squire meters for the base 3 Construct main gr...

Страница 6: ...and phase sequence The earth cable shall be connected to the grounding bar of the charger Wiring illustration is shown in elow Please notice For safety the charger must be grounded securely Connect th...

Страница 7: ...charge mode payment is not needed 2 is APP or RFID mode No Parameters Function description 8 9 10 Time set Language set Meter address DC meter s modbus address already preset in factory it is not allo...

Страница 8: ...rvoltage value DC output overcurrent value AC input overvoltage value AC input undervoltage value AC input overcurrent value DC output limit power Charger over temperature value Charger derate tempera...

Страница 9: ...and payment provided that the back office server supports such function 4 5 2 3 1 APP RFID mode operation process flow Plug Charge Charging will start automatically after EV plugged in If you want to...

Страница 10: ...when entering each parameter setting page Password window Before entering numeric please first press the text display field to move the cursor there then you can type in the 4 digit password A wrong p...

Страница 11: ...e disconnection fault AC Contactor sticking fault AC Input Overvoltage AC Input Undervoltage BMS communication fault VI Specification Model EVD 60D Dimension mm 1883 600 743 W H D Weight kg 240KG Disp...

Страница 12: ...C output Over temperature protection Short circuit protection Emergency stop protection Lightning protection Leakage protection 20 50 Ip54 95 2000m derate for higher than 2000m Forced air cooling Ethe...

Страница 13: ...etc 4 Failure or damage caused by the installation repair modification or disassembly byunauthorized service personnel 5 Failure or damage caused by using ATESS Power Technology s genuine spare parts...

Отзывы: