Pilot´s Operating Handbook of ATEC 322 Faeta LSA with Rotax 912iS engine
ATEC v.o.s. Libice nad Cidlinou, Czech Republic
Page 41 of 56
8.1.
Maintenance Schedule
Inspection, Mandatory Work
Inspection Period
(hours)
10 25 50 100 200
Engine
As per ROTAX Manual attached.
Engine Compartment
Engine Bed
Check integrity of construction with a special focus on welds, fixing
points, silent blocks, bushings. Check surface condition.
x
Bolted Connections
Check surface condition of bolted connections, bearing surfaces. Check
securing and tightening. Tighten and re-secure if necessary. Replace
locking nuts, split pins and securing wires.
x
Silentblocks
Check elasticity of engine bearing, integrity of rubber blocks, degree of
permanent deformation. Replace silent blocks if necessary, tighten,
secure.
x
Oil, Water and Fuel Hoses
Check surface integrity, liquid leak proofness, condition of connections,
protection avoiding touch with oscillating parts and exhaust system.
Replace if necessary.
x
Working Liquids
Check level, refill according to instructions of engine producer.
x
Coolers
Check integrity, sealing, purity.
x
Controls
Check control forces, free play, hinges, end stops adjustment, self-
locking. Adjust, secure.
x
Exhaust piping
Check integrity, sealing, surface condition, corrosion degree, springs
condition and springs prestress. Grease ball connections with a special
lubricant.
x
Carburettors
Check surface condition, controls adjustment, condition of elastic
connection flange – integrity, sealing. Replace flange if material
degradations or surface cracks appear.
x
Electric Installations
Check condition, integrity and purity of cables, insulation, contacts,
welds, bunched cables attachments to airframe and bushings. Check
gauges and senders connections.
x
Propeller Attachment
Check condition of bolts, tightening moments, securing.
x