background image

AWM-2-LTH75-H Page 3 of 6

AWM-P

Post

COMPONENT CHECKLIST

A

Post

(x1)

C

Screw

M8

(x2)

B

Post Cap

(x1)

E

Cable Cover

(x2)

D

Cable Cover Cap

(x4)

3. 

Position Cable Cover and fit Post Cap

3.1

 To reposition the cable cover, pull it straight up and out 

of the post and insert it into any of the available channels

3.2

 Fit post cap onto the top of the post

SQUEEZE

SQUEEZE

SQUEEZE

SQUEEZE

Optional cable 

cover positions

Allen Key

(Supplied w/fixing)

Post

Post Cap

NOTE:

 An allen key 

may be stored in 

the Post Cap.

1. 

Attach Post to Fixing

FC

C Clamp

FB

Bolt

Through 

Kit

AC-GC

Grommet 

Clamp

FH

HD F Clamp

FF

F Clamp

FC

C Clamp

FB

Bolt

Through 

Kit

AC-GC

Grommet 

Clamp

FH

HD F Clamp

FF

F Clamp

FC

C Clamp

FB

Bolt

Through 

Kit

AC-GC

Grommet 

Clamp

FH

HD F Clamp

FF

F Clamp

Supplied

Heavy Duty

F Clamp

AWM-FH

Also Compatible

Grommet

Clamp

AC-GC

1.1 

Follow the Heavy Duty F Clamp installation 

guide on pages 2 of this booklet or provided 
with your alternate fixing option.

2. 

Mount Clamp to Post

2.2

 Do not mount monitor 

arm on rear channel post 

when using the supplied 

Heavy Duty F Clamp

2.1

 Slide clamp into post and 

position to desired height. Turn 

knob to lock in place.

 

If you are installing multiple mounts, 

use the guide marks on post as 

reference for setting the height of 

each arm. Final fine-tuning may be 

required once monitor is installed.

NOTE:

 Guide marks only available on 

400 post, 510 post and 750 post. 

4. 

Cable clips and cover

PUSH

4.1

 Push the cable down 

into the cable clip.

4.2

 Insert one 

side of the cable 

clip into the 

channel on the 

post assembly, 

then push 

in the other side.

4.4 

Feed 

remaining 

cable into 

the cover.

Load cables 
into cable 
cover

4.3 

Loop cable 

and insert into 

cable cover.

Cables can 

exit from the 

side of the 

cable cover

PUSH

PUSH

Отзывы: