background image

 

ATD2P9F   
Jun 2017 

 

PREPARATION 

The installation of this lift is relatively simple and can be accomplished by 2 men in a few hours. The 

following tools and equipment are needed: 

  12 quarts of Non-Detergent / Non-Foaming Hydraulic Oil - SAE-10, AW 32 or equivalent     

  Chalk line and 12’ Tape Measure     

  4ft. Level 

  Rotary Hammer Drill with 3/4” Masonry Drill Bit. (Core Drill Rebar Cutter also recommended) 

  Hammer and Hex Key Wrench Set 

  Metric Sockets and Open Wrench set - 13mm-30mm 

  Medium Adjustable Wrench and Medium Pipe Wrench 

  Crow Bar for Shim Installation and Medium Flat Screwdriver 

  Locking, Needle Nose and Snap Ring Pliers 

 

GENERAL INFORMATION 

1.  Carefully remove the crating and packing materials.   

CAUTION! Be careful when cutting steel banding material as items may become loose and fall 

causing personal harm or injury. 

2.  Identify the components and check for damage or shortages.   

Please contact your distributor immediately, if any damages or shortages are discovered.   

 

Packing

  The lift assembly is packaged into two columns as one piece, as shown in (Fig.1)

  Every column comes with its cylinder, carriage, cables & chains, lifting arms, swivel pads, height 

extensions, hoses and drive-over floor plate with the hardware box located in one of the columns. 

 

The electric-hydraulic motor pump is packaged separately and banded to top of lift.

               

 

   

 

 

 

 

 

 

 

 

 

 

Fig. 1

Содержание ATD2P9F

Страница 1: ...Jun 2017 ATD2P9F Two Post Floor Plate Lift Symmetric 9 000 lbs Capacity 2 250 lbs Max per Arm INSTALLATION OPERATION MANUAL...

Страница 2: ...y part of the vehicle Improper use of this equipment could result in damage to the lift yourself or other property The lift is intended to lift vehicles only It is not designed to lift any person or e...

Страница 3: ...rewdriver Locking Needle Nose and Snap Ring Pliers GENERAL INFORMATION 1 Carefully remove the crating and packing materials CAUTION Be careful when cutting steel banding material as items may become l...

Страница 4: ...ATD2P9F Jun 2017...

Страница 5: ...P 1 Selecting Site Before installing your new lift check the following 1 LIFT LOCATION Always use architects plans when available Check layout dimension against floor plan requirements making sure tha...

Страница 6: ...ATD2P9F Jun 2017 Fig 3 Fig 4 Column Floor Layout 134 5 8...

Страница 7: ...used in the assembly of the lift 4 Take out the drive over floor plate lifting arms swivel pads height extensions hardware box hoses covers etc from the column Check the quantity of each item with th...

Страница 8: ...shimming is required that enough threads are left exposed 6 Using a level check column plumb for every side Fig 6 If shimming is required use supplied Shim stock or 3 4 washers placing shims as close...

Страница 9: ...l the power unit is clean Suggestion Use Non Detergent Non Foaming Hydraulic Oil SAE 10 AW 32 or equivalent The unit holds approximately ten quarts of fluid Fig 9 STEP 7 Installing Routing EQUALIZER C...

Страница 10: ...Cont Cable Routing Diagram Fig 13 5 Repeat above for the second cable 6 Adjust each equalizer cable to approximately 1 2 side to side play Ensure that each cable has equal tension Check the carriage h...

Страница 11: ...ng the hydraulic 90 degree Fitting s threads are fully tightened against the outside of Main column as shown in Fig 14 15 Fig 14 Fig 15 Fig 16 CAUTION When routing the hydraulic hoses make sure hoses...

Страница 12: ...ms Floor Plate Arm Restraints Cont 3 Install Arm Restraint mechanisms to each swing arm as detailed below Fig 17 4 Check for proper engagement for the arm restraints as the gear rack should fully enga...

Страница 13: ...unit Use a separate circuit for each power unit as shown below in Figs 18 19 Fig 18 IMPORTANT The wiring must comply with local code Protect each circuit with time delay fuse or circuit breaker For 2...

Страница 14: ...draulic system 2 To lower the lift both carriage s safety latch releases must be manually pulled down to be released to lower lift Fig 20 The latches will automatically reset once the lift ascends app...

Страница 15: ...and drop into each latch stop 8 Press lowering release lever on Power Unit to lower lift onto latches to lock the lift in the proper safety position Note Always lock the lift before going under the v...

Страница 16: ...ng Prior to lowering vehicle walk around the lift and check for any objects that might interfere with the operation of lift and safety latches tools air hoses shop equipment After lowering lift swing...

Страница 17: ...d tighten anchors bolts nuts and screws Check wiring switches for damage Keep base plate free of dirt grease or any other corrosive substances Check floor for stress cracks near anchor bolts Check swi...

Страница 18: ...for deformation or damage Check cylinder mount for looseness and damage Relocating or changing components may cause problems Each component in the system must be compatible an undersized or restricte...

Страница 19: ...ft B Bad capacitor call electrician C Low voltage call electrician D Faulty wiring call electrician 5 Lift jerks going up and down A Air in hydraulic system raise lift all the way to top and return to...

Страница 20: ...POWER UNIT PRIMING WARNING Failure to properly relieve pressure in the following steps can cause injury to personnel Step 1 Locate the check valve It is the plug to the left of the lowering valve...

Страница 21: ...ATD2P9F Jun 2017 EXPLODED VIEW 1...

Страница 22: ...ATD2P9F Jun 2017 EXPLODED VIEW 2...

Страница 23: ...7 2 2000 D12 Flat Washer D12 4 16 TP9KFX 016 GB70 85 M12X20 Socket Screw M12x20 4 17 TP9KFX 017 TT 6934 046405772 Rubber Pad Swivel Pad 4 18 TP9KFX 018 TT 6934 048417190LKY Swivel Pad weldment 4 19 TP...

Страница 24: ...54 TT 6934 500 03 90 degree Hyd Fitting 1 45 55 TP9KFX 055 TT 6835 500 01 MS Low Hyd Hose 1 56 TP9KFX 056 TT 6934 500 04KY Pump Hyd Fitting 1 45 57 TP9KFX 057 O RING O Ring D14 1 D14 58 TP9KFX 058 PU...

Страница 25: ...ATD2P9F Jun 2017...

Отзывы: