Installation 17
4 Installation
Overview
This section contains information necessary for the installation of the TC V3 Conformal Curing Oven.
•
Facility Requirements
•
Unpacking and Placing the Cure Module
•
Leveling the Cure Module
•
Anchoring the Cure Module
•
Connections
Safety First
Before operating or performing maintenance on any of the equipment described in this section, please
review the important information provided in the
Safety
section.
Facility Requirements
•
The equipment should be installed in a location with enough light to allow all moving and
fixed parts of the Cure Module to be illuminated correctly.
•
The floor should be level and if possible covered with a non-flammable floor covering. See
"
Leveling the Cure Module
"
in this section.
•
Adequate space must be provided around the Cure Module in order to facilitate maintenance
operations.
Unpacking and Placing the Cure Module
To unpack and place the Cure Module:
1. If the Cure Module was shipped in a wooden crate, use a flat bar and hammer to remove the
lid and sides of the crate.
WARNING!
CAUTION!
Personnel should wear gloves and safety glasses while removing the top and
sides of the crate. Sufficient personnel should be used to lift and control the
crate.
2. Remove all packaging material from the outside and inside of the Cure Module.
3. Remove any bolts and brackets securing the Cure Module to the pallet.
4. Use a forklift to gently lift the Cure Module off of the pallet.
"
NOTE
Lift the Cure Module from the very bottom, between the feet.
Содержание TC V3
Страница 1: ...Conformal Curing Oven TC V3 Operations Manual ...
Страница 6: ......
Страница 20: ......
Страница 30: ......
Страница 59: ......