![Astoria 2GR Скачать руководство пользователя страница 41](http://html.mh-extra.com/html/astoria/2gr/2gr_use-and-maintenance-manual_2990323041.webp)
41
of
92
TECHNICIANS manual
ENGLISH
8.3.5 Maintenance report
The following information can be viewed in this sec-
tion:
•
Type A maintenance cycles;
•
Type B maintenance cycles;
•
Type C maintenance cycles;
•
date of next maintenance;
•
Water consumption (litres);
•
Grinder wear (kg);
•
Saved energy.
To reset the data to zero, select the
button.
To programme the date for machine assistance
prompts, e.g. when the display notifies you that the
scheduled maintenance must be performed, press the
button. Using the
and
buttons or the
display keyboard
, enter the desired date.
To go from one page to another, select the
button.
MAINTENANCE
Inspections
Maintenance
threshold
Heating unit
efficiency
Change serial
number
actuator tests
Restore
parameters
Maintenance
report
Warning
history
Counters
User buttons
activation
Reset data
SERVICE SETTINGS
Maintenance
View delivery
Recipe library
Software
Washes
Language
Parameter list
Energy saving
& cloud
Service
parameters
Coffee
temperatures
Water filters
Menu
calibration
1/2
MAINTENANCE REPORT
type A maintenance cycles
type B maintenance cycles
type C maintenance cycles
date of next maintenance
reset
reset
ok
date of next
maintenance
reset
reset
------------
-----
2/2
MAINTENANCE REPORT
water consumption
Wear Grinder Blades
Saved energy
reset
reset
reset
0
0
0
lt
kg
kWh
Содержание 2GR
Страница 91: ......