The shower tray needs to sit on a flat level base for proper support. Ensure that
the area for the shower tray is properly prepared for installation.
Using the drawing provide place the floor drain in the proper location so that the
shower tray drain and the floor drain are in line after final installation .
Place the shower tray in the final installation position line up the drain holes and
check for level. If not level make adjustments to the floor at this time.
Preparation of base
for installation of shower tray
5
Содержание SD908
Страница 23: ......