1. Slide door stopper (1) onto end of top rail (2) See figure 1. The bumpers on door
stopper (1) should be positioned on the top of top rail for final installation. Note:
One door stopper comes pre-assembled on top rail between fixed glass bolt
assembly. See figure 1.
2. Position the top rail (2) and fixed glass (3) as shown in figure 2 and connect fixed
glass (3) to top rail (2) following the assembly sequence shown in figure 2. Note
in figure 2, one door stopper (1) should be positioned between mounting holes in
top rail (2) before connecting top rail to fixed glass.
NOTE: TOP RAIL IS ATTACHED TO THE INSIDE OF FIXED GLASS.
3. Slide the rail end assembly (5) (6) on to end of top rail (2) to be connected shower
wall. Loosely tighten the rail end assembly (5) into place on top rail (2) making
sure the rail end assembly is fully engaged on top rail. See figure 3. Repeat for the
other side.
4. Position the top rail fixed glass assembly into place in your shower.
NOTE: THE TOP RAIL ATTACHED TO FIXED GLASS SHOULD BE POSITIONED
TO INSIDE OF SHOWER.
Using a level, verify the top rail (2) is horizontal and the fixed glass (3) is plumb.
See figure 4-1.
Using a pencil, mark the rail ends onto the wall. See figure 4-2.
5. Remove pre-installed screw from pre-assembled glass clamp ( 7). Position the side
of the glass clamp (7) with shower base mounting hole on the shower base and
align with large hole opening on bottom of fixed glass (3). Mark the mounting hole
of glass clamp (7) at this position. See figure 5.
NOTE: If your surface is prone to cracking or chipping then it is recommended
that you pilot drill first using a smaller drill bit, and then step up to the final size.
6. Using the appropriate drill bit for your tray surface drill hole locations with 1/8"
diameter drill bit.
10
Содержание Langham SDR978
Страница 18: ...Installing the door seals Install the door seals according to the drawing 1 7 ...
Страница 25: ...Notes 24 ...
Страница 26: ...Notes 25 ...