39
EN
Mounting preparation
Ensure the following before mounting:
· The planning process is concluded.
· The Hi-O group function and necessary terminals are defined and the DIP switch
positions are set correctly.
· The bridge is set correctly on the pins (jumper).
· The cables are identified and the wiring is completed.
· The necessary depth is available for flush installation of the switch box.
· It has been assured that protection category IP30 has been achieved after
mounting.
Mounting
Fig. 3 :
Mounting example
Prerequisites
Mounting
Содержание N5951000PILL000
Страница 25: ...25 DE ...
Страница 49: ...49 EN ...
Страница 73: ...73 FR Accessoires entretien garantie élimination ...
Страница 97: ...97 IT ...
Страница 121: ...121 NL Toebehoren onderhoud garantie afvalverwijdering ...
Страница 122: ...122 NL ...
Страница 123: ...123 NL ...