69
Operation
EN
Emergency opening of an Integra product
The test device or the electronic control device supply the Integra products with sufficient voltage to
enable authorisation to take place directly on the device with an ID. The steps required for an emergency
opening depend on the Integra product used.
Integra digital cylinder
The batteries are located on the outside of the Integra digital cylinder.
Replacing batteries
1
Change the batteries (see the instructions included with the product).
2
Carry out a function test (see the instructions included with the product).
Integra fitting
No authorisation key is required for emergency energising the Integra fitting. The Integra fitting is con-
nected to the programming device via the supplied USB-OTG cable.
Fig. 18 :
Integra fitting
1.
Fitting
Содержание Keso K.536
Страница 27: ...27 Bedienung DE Abb 15 Elektronik konfigurieren Firmware Update 3 1 2 1 2 3 ...
Страница 29: ...29 Bedienung DE Abb 16 Daten und Berechtigung mit dem Key Tool einlesen und prüfen 2 1 4 3 ...
Страница 39: ...39 Problem Ursache Lösung DE ...
Страница 65: ...65 Operation EN Fig 15 Configure electronics firmware update 3 1 2 1 2 3 ...
Страница 67: ...67 Operation EN Fig 16 Read and check data and authorisation with the key tool 2 1 4 3 ...
Страница 77: ...77 Problem cause solution EN ...
Страница 103: ...103 Utilisation FR Fig 15 Configurer un composant électronique mise à jour du firmware 3 1 2 1 2 3 ...
Страница 105: ...105 Utilisation FR Fig 16 Lire et vérifier les données et les autorisations avec l outil clé 2 1 4 3 ...
Страница 115: ...115 Problèmes causes solutions FR ...
Страница 141: ...141 Uso IT Fig 15 Configurazione del sistema elettronico Aggiornamento firmware 3 1 2 1 2 3 ...
Страница 143: ...143 Uso IT Fig 16 Lettura e controllo dei dati e dei diritti con il Key Tool 2 1 4 3 ...
Страница 153: ...153 Problema causa soluzione IT ...
Страница 154: ...154 IT Problema causa soluzione ...
Страница 155: ...155 Problema causa soluzione IT ...