9
ED3400/ED3400A Series
Installation Instructions
Surface Vertical Rod
FM361 04/20
Copyright © 2020 ASSA ABLOY Access and Egress Hardware Group, Inc. All rights reserved. Reproduction in whole or in
part without the express written permission of ASSA ABLOY Access and Egress Hardware Group, Inc. is prohibited.
For installation assistance contact Corbin Russwin
1-800-543-3658 • [email protected]
j
Mount Bottom Strike
Mark and install according to appropriate template and the following information. For surface -applied
strikes:
1. Transfer vertical centerline to floor or threshold and mark.
2. Center strike on the marked line.
3. Mark mounting holes. (If using Flush Bottom Strike (S03), mark mounting holes and outline of strike.)
4. Drill holes for screws.
5. Mount strike with screws provided.
6. Tighten screws.
Figure 23
Metal: #12-24 x 1/2"
Phillips Flat Head
(Total = 2)
Surface Projecting Bottom Strike
Mounting Screws Actual Size
Surface Projecting Bottom Strike
Mounting Screws Actual Size
Wood: #12 x 1"
Phillips Flat Head
(Total = 2)
1/4 -20 x 2" Phillips
Flat Head (Total = 2)
Flush Bottom Strike Mounting Screws - Actual Size
Surface Projecting
Bottom Strike
Flush Bottom Strike
(S03)
Figure 22