![aspenhome I218-402-SHL Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/aspenhome/i218-402-shl/i218-402-shl_assembly-instructions-manual_2984895003.webp)
aspenhome
R
ASSEMBLY INSTRUCTIONS
MADE IN VIETNAM
ah
I
ITEM NO:
I218-422-WHT/SHL Queen Uph HB
I218-403-WHT/SHL Queen Low Profile FB
I218-402-WHT/SHL Queen Rails w/ Decking
01-02-2020
STEP 5: Put the decking over the slats, secure decking to the slats with wood screws (J) through
the pre-drilled holes in the decking as shown below.
Pre-drilled hole
Make sure that there is a slat
under the pre-drilled hole.
J
Decking
Slat
Page 3/6
STEP 4: Arrange slats on the slat bearers and then lay the decking on top of the slats. Make sure
the top and bottom slats are situated underneath the pre-drilled holes as shown below in STEP 5.
Remove the decking and attach slats to the slat bearers with wood screws (I).