![aspenhome I218-402-SHL Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/aspenhome/i218-402-shl/i218-402-shl_assembly-instructions-manual_2984895023.webp)
aspenhome
R
ASSEMBLY INSTRUCTIONS
MADE IN VIETNAM
ah
STEP 3: Screw the bolts(E) into HB & FB. Align the bolts with the holes in the end of side rails
and attach the side rails to HB & FB using half moon washer(F),and hex nuts (G).Then use a hex
wrench to tighten all the nuts.
Side Rail
E
F
G H
Slat bearer
Support Leg
Leveler
This End Up
Slat
STEP 4: Remove the support legs (top)
as shown in the picture
to the right
. Attach the support legs with leveler to the slats.
Adjust the levelers on bottom of support legs when necessary.
Remove
Support Leg(top)
I218-507
I218-514
The holes are for
Hollywood frames
I218-525
I
ITEM NO:
I218-525-WHT/SHL Full Uph HB
I218-507-WHT/SHL Full Low Profile FB
I218-514-WHT/SHL Full Rails w/ Decking
STEP 5: Arrange slats on the slat bearers and then lay the decking on top of the slats. Make sure
the top and bottom slats are situated underneath the pre-drilled holes as shown below in STEP 6.
Remove the decking and attach slats to the slat bearers with wood screws (I).
Page 5/6
01-15-2020