25
2-8. TEST Mode
1) PCB TEST MODE
A. How to enter the mode:
Turn
the power on while pressing Dry Sensor and Temp. buttons.
B. Operation order : check load by pressing Dry Time button continually.
Fixed resistance of the temp sensor : 1.7 K
Ω
2) TEST MODE
A. How to enter the mode:
Turn
the power on while pressing Dry Sensor and Dry Time buttons.
B. Operation order: check load by pressing Dry Time button continually.
No.
Operation Load
Time (Sec)
DISPLAY
Miscellaneous
1
F PCB LED ALL On
6.0
ALL LED
2
Humidity sensor check
2.0
1 : xx
3
Temp sensor check
2.0
2 : xx
4
Door S/W check
2.0
dc --> do
5 Motor
check 2.0
6
Heater-Outer check
2.0
H1
7 Heater-Inner
check 2.0
H2
8
Power off
0.3
F
Total time
18 seconds
No.
Operation Load
Time (Sec)
DISPLAY
Miscellaneous
1
Motor On
0.5
1 : nr
2
Heater 1 on
0.5
2 : H1
Current : 13A
3
Heater 2 on
0.5
3 : H2
Current : 23.5A
4
Heater 1, Heater 2 off
0.5
4 : nr
5
Humidity sensor check
1.0
5 : number
Check based on the
variations of numbers
6
Temp sensor check
0.5
6 : number
Surrounding temp indicated
Open the door at 6th pressing
0.5
6:00
Motor off
Press the start button
0.5
6: number (Motor on)
Door S/W check
after closing the door.
Power off
0.3
Power section
Total time
About 5 seconds
Содержание TL751 XXLT
Страница 1: ...Service Guide Tumble dryer Version1 2008 02 13 Asko TL751 XXLW TL751 XXLT...
Страница 29: ...28 ELECTRIC DRYER TL751 WIRING DIAGRAMS...
Страница 43: ...42 7 Remove wires and 2 screws that mount the switch 8 Assemble the parts in reverse order Belt Switch...
Страница 53: ...52 TERMINAL BLOCK 1 Remove terminal block cover 2 Remove 3 screws...
Страница 55: ...54 4 Dismantling of fan case Remove 3 screws 5 Dismantling of motor bracket Remove 2 motor clamps...
Страница 56: ...55 HEATER ASSEMBLY 1 Remove 4 screws 2 Unfold 4 side tabs 3 Remove thermostat 2 screws 4 Remove 13 screws...
Страница 57: ...56 LAMP ASSEMBLY 1 Remove 1 screw...
Страница 60: ...59 4 Door Switch...