
Engl
ish
57
Quality Control in
Post-Processing
You can place a quality control filter through which
MobileMapper Office will rate the post-processing results
according to your own requirements. Following the post-
processing of your job, MobileMapper Office will associate
the resulting vectors to two different layers: one containing
the vectors that passed the quality control (green vectors),
and a layer containing those that failed (red vectors).
•
Click
and then on the
Options
button located in the
lower-right corner of the pop-up window.
•
Enter your three quality control settings, i.e. the maximum
permitted values for HRMS, VRMS and PDOP. (see screen
example below).
•
Click
OK
to confirm your filter settings.
All the vectors for which the HRMS, VRMS and PDOP are
less than those specified here will pass the quality control
whereas all the others, if any, will fail.
Note that the quality control filter is applicable to all the
jobs you open in MobileMapper Office, until you modify
the filter settings. To remove the filter, you just need to set
the three fields blank and click
OK
.
Note also that the PDOP characterizes each point when it
was logged (the PDOP is re-calculated by MobileMapper
Office, based on the content of the job file). In contrast,
the HRMS and VRMS are part of the post-processing
results and characterize the post-processed positions.
Export Function
MobileMapper Office can export the visible layers from the
open job to two different formats:
•
ASCII format (*.csv). Each selected layer will result in a
separate csv file.
Содержание MobileMapper 100
Страница 1: ...MobileMapper 100 Getting Started Guide DRAFT 1 July 28 2010...
Страница 2: ......