14
Solids Handling Pumps
Models: ANC200/300/500/750/1000/1500 /2000
& ANCV200/300/500/750/1000/1500 /2000
Wiring Diagram
WIRING CONNECTIONS
1. All electrical wiring must be in accordance with local
code and only qualified electricians should make the
installations.
2. Three phase pumps - instructions for wiring to control
panel will be included with control panel.
3. All wires should be checked for shorts to ground with
an ohmmeter or megger after the connections are
made. This is IMPORTANT, as one grounded wire can
cause failure of the pump, control panel or personal
injury.
Figure 3
BB
WW
RR
BB
WW
RR
RR
WW
BB
R(R(
T1T1
))
W(W(
T2T2
))
BB((
TT33
))
GG
GG
BB
WW
RR
BB
WW
RR
RR
WW
BB
GG
GG
TT11
TT77
T2T2
T8T8
TT33
TT99
T4T4
T5T5
T6T6
BB
WW
RR
BB
WW
RR
RR
WW
BB
GG
GG
T1T1
T4T4
T2T2
T3T3
TT77 T5T5 T8T8 T6T6 TT99
BB
WW
RR
RR
WW
BB
GG
GG
BB
WW
RR
GG
BB
WW
RR
GG
RR
WW
BB
GG
RR
WW
BB
GG
208/230 VOLT - SINGLE PHASE
STATOR
STATOR
STATOR
HEAT SENSOR
ON STATOR
HEAT SENSOR
ON STATOR
HEAT SENSOR
ON STATOR
CONTROL CORD
CONTROL CORD
CONTROL CORD
POWER CORD
POWER CORD
POWER CORD
CONNECTORS
CONNECTORS
GROUND SCREWG
ROUND SCREW
GROUND SCREW
ELECTRODE
ELECTRODE
ELECTRODE
CONNECTORS
208/230 VOLT - THREE PHASE
460 VOLT - THREE PHASE