2
VI. Installation
Fig. 3 Base and wiring diagram
1.
Use two M4 screws to fix the DZ-9091K base via the
two elliptic screw holes(see Fig.3), then connect the
power cables with the Terminal 1& 3 (1 connected
with positive,and 3 with negative.1.5mm2 or above
fire cable for the power input is recommended.),
finally twist the main body onto the base.
2.
If the sounder Beacon is required to be tamper-proof,
fix it with ST2.9
×
5 self- tapping screws thought the
tamper-proof hole (see Fig. 4)on the base.
Fig. 4
VII.Sound Level Data(EN54-3 approved)
Tone1:[email protected],MaxVolume,dB(A)@1m
VIII.Coverage Volume(EN54-23 approved)
Fig. 5 Ceiling mount coverage volume
Fig. 6 Wall mount coverage volume
ASENWARE LTD
ADDRESS: 6 PROSPECT WAY, ROYAL OAK INDUSTRIAL
ESTATE DAVENTRY, NORTHAMPTONSHIRE, ENGLAND,
NN118PL
WEBSITE: www.asenware.com
EMAIL:
Angle
Horizontal
Vertical
Volatage
20V
28V
20V
28V
15
°
77.5
81
78.1
81.4
45
°
77.9
81.1
78.4
81.7
75
°
84.4
88.1
84.8
88.6
105
°
84.6
87.7
84.7
87.9
135
°
77.3
80.4
76.6
80
165
°
77.9
81.3
77.5
81.5
C-3-8
X
Z
V(m
3
)
8m
3m
150.8
W-2.4-6
X
Y
Z
V(m
3
)
6m
6m
2.4m
86.4