TD 91684GB
16 April 2015 / Ver. G
Installation Guide
T942C and T942C/2 Central Unit
27
4
Document History
Version Date
Description
D
10 May 2012
E
29 November 2012 Added:
3 Programming T942C Central Unit
Updated:
PDM added throughout in the document.
F
13 January 2013
Updated:
on page 25: new 942C parity
parameter added.
G
16 April 2015
Added:
Added the following info in
page 1: For 541293A, rev. 3A or later and T942C2, rev
2A or later: Ferrite beads must be mounted on all
cables to fulfill regulatory requirements regarding
EMC. (Issue AMCH-62)
Added a photo showing ferrite beads mounted on
cables. (Issue AMCH-62)
For details in the latest version, see change bars in the document.