TD 92372GB
2007-06-18/ Ver. E
Installation and Operation Manual
IP-DECT Base Station & IP-DECT Gateway
20
Figure 26.
l
a
n syn
c
hroniz
a
tion referen
c
e
1 2 ring in ring out in out
ba
se st
a
tion 01 02 03 04 05 06 07 0
8
09 10 11 12 13 14 15 16
009
{
{
{
1
2
3
Figure 12. Install the IPBL
The main steps of the installation is described below:
1
Install the IPBL in a standard 19’’ rack.
2
Pin the cables, see
3
Connect the cables in the following order:
• Ethernet cable (1)
• Synchronization cable (sync ring, reference sync) (2)
• Base station cable (RFP cable) (3)
IMPORTANT:
The connected RFPs must
not
be connected to protective earth.
4
Attach the power cable, see
5
Monitor the total current consumption from the GUI. See
page 59. Make sure it not exceeds the following values:
• Max current consumption is 4,0 A when supplied with 110/230 VAC.
• Max current consumption is 5,2 A when supplied with 48 VDC.
Note:
The IPBL current consumption is 0,3 A and is included in max current
consumption.
For more information of power consumption of the RFPs, see