ASAP Safety Ltd.
Unit 11, Oaktrees Business Park, The Courtyard, Orbital Park, Ashford, Kent. TN24 0SY
Tel: 07949
377
975
www.needasap.co.uk
Figure 7
Figure 8
Figure 9
Страница 1: ...INSTALLATION GUIDE...
Страница 2: ...narios encountered on new build sites There are 2 systems available for different types of openings The components are colour coded either yellow or blue The colour indicates what opening it should be...
Страница 3: ...t sits over the stairwell opening Collars must be used on the main beam if a side beam is to land on the narrow extended section of the main beam Secure the beam by inserting two 50 mm x 6 screws into...
Страница 4: ...anyone needing to work over the stairwell opening see figure 6 DO NOT EXCEED THE SWL AT ANY TIME 9 The timber stud walls and bulkhead can now be constructed leaving the platform in place To do this t...
Страница 5: ...ASAP Safety Ltd Unit 11 Oaktrees Business Park The Courtyard Orbital Park Ashford Kent TN24 0SY Tel 07949 377 975 www needasap co uk Figure 7 Figure 8 Figure 9...
Страница 6: ...s will need to pull out each end of the main beam and retract it to its minimum length for its safe removal from the stairwell opening Carry the main beam down the stairs and remove from the plot for...
Страница 7: ...The Courtyard Orbital Park Ashford Kent TN24 0SY Tel 07949 377 975 www needasap co uk Further information can be found on our website www needasap co uk Or by contacting us directly Email info needas...