Each System will require a quantity of scaffold boards to overlay the stairwell opening. 

The scaffold boards will need to be cut and strapped at each end and then fitted to the 

opening.

 

Installation: 

1. Choose the correct coloured system to suit the stairwell opening and place upstairs.

 

2. Place the required number of scaffold boards needed to cover the stairwell upstairs in a 
safe location.

3. Once this has been done hang the ‘warning’ sign at the bottom of the stairs to warn other 

 

workers that work is being done above head.

4. Two operatives then lift, insert and spread the telescopic main beam from one end of the 

 

stairwell opening to the other so the L-shaped end bracket sits over the stairwell opening. 

 

Collars must be used on the main beam if a side beam is to land on the narrow-extended 

 

section of the main

 

beam. Secure the beam by inserting two 50 mm x 6 screws into each 

 

end. (See figure 1 and 2).

5. Spread all seven beams evenly throughout the stairwell over the main beam at the U-
shaped end and extend the L- shaped until it rests on the flooring. Spread the side beams 
evenly along the main beam at a maximum of 600mm. (If structural newel is present place two 
beam either side of the newel at a maximum of 50mm).  The side beams are secured at the 

 

L-shaped end bracket by inserting two 50 mm x 6 screws. (See figure 3,4) if anything was 

 

to block these holes use the vertical hole provided. 

6. Measure the length of the stairwell opening and cut all scaffold boards to the correct 
length. Each cut end must now have a new board band installed to stop the board splitting. 

 

Boards can then be marked to show they are certain stairwell or house type.

 