Manual No. 590770 (August 2012)
ART’S-WAY MANUFACTURING COMPANY, INC.
56
DEALER ASSEMBLY INSTRUCTIONS
8. On harvesters with the 12 row 22 inch or 8 row 30
inch, install the front header gage wheels on the front
corners of the header with the clamps provided. The
suggested setting is 3.5 inches (8.89 cm) (4 x 4) with
the lifter wheels on concrete. Optional front mounts
attach gage wheels to front of head.
Figure 94. – Front Header Wheels (12 Row 22 and 8
Row 30 Only) (Optional On 6 Row 28/30, and 8 Row
22)
Figure 95. – Wheel Mounts, Front (Optional)
3 1/2"
ARTS-WAY
491740
4 x 4 WOOD BLOCK
Figure 96. – Front Header Wheels Height
9. Install the grates on the off loading conveyor using
0.5 x 3.75 inch (1.27 x 9.525 cm) HHCS, two (2)
fl
at
washers, lock washer, and nut.
10. Install the boom extension on the 8 Row 30 or 12
Row 22 machine. See separate instructions.
Figure 97. – Off-loading Conveyor Grates
11. Connect the upper mounting of the truck conveyor
hydraulic cylinders.
12. Install draper chain in the tank and boom. Make
sure lap is proper direction (top surface trailing). See
Figure 98.
13. Install two tank extensions and grates on transfer
elevator, as shown in Figure 100 and Figure 101.
Содержание 6812B
Страница 2: ......
Страница 16: ...Manual No 590770 August 2012 ART S WAY MANUFACTURING COMPANY INC 10 Safety Decals ...
Страница 17: ...ART S WAY MANUFACTURING COMPANY INC Manual No 590770 August 2012 Safety Decals 11 ...
Страница 19: ...ART S WAY MANUFACTURING COMPANY INC Manual No 590770 August 2012 Safety Decals 13 ...
Страница 20: ...Manual No 590770 August 2012 ART S WAY MANUFACTURING COMPANY INC 14 Safety Decals ...
Страница 71: ......