FE-FC
a)
b)
Work Wall - Lower
31
Conference Installation Guide - February 2013
Step 2
a) On the lower panel, make sure levelers are screwed-in completely.
Install the lower panel by inserting the hook brackets in the link
bracket holes of the upper panel.
LEVELER
Step 1
Install the 2 link brackets on the back of the
upper
panel
using the pre-drilled holes.
Hang the panel on the support cleat.
Reinstall nuts & bolts, do not tighten yet.
Adjust the panel so it is vertically level and tighten bolts.
(2) LINK BRACKETS
INCLUDED WITH LOWER WORK WALL
Note:
The lower work wall panel must be installed under an upper panel
of the same width
.
The lower panel must be pressed against
the bottom of the upper panel.
b) Lift the lower panel so the hook brackets are well anchored to the link
brackets and unscrew the levelers in order for the lower panel
to remain firmly in place.
Installation of wall panels
HOOK BRACKETS
Содержание conference
Страница 1: ...conference Installation Guide February 2013...
Страница 4: ...1 BASES Conference Installation Guide February 2013...
Страница 13: ...2 SURFACES Conference Installation Guide February 2013...
Страница 17: ...3 ELECTRICITY AND CABLE MANAGEMENT Conference Installation Guide February 2013...
Страница 22: ...4 STORAGE Conference Installation Guide February 2013...
Страница 26: ...5 PRESENTATION BOARD Conference Installation Guide February 2013...
Страница 28: ...6 WORK WALLS Conference Installation Guide February 2013...