FE-FC
Electricity & Cable Management
21
Conference Installation Guide - February 2013
Work Wall with Credenza
Example showing cable management.
The
"
back-of-credenza grommet option"
allows cable passage from inside the
credenza to the wall
The
notch
option
on the lower panel allows
cable passage when a credenza is placed
in front of the panel
A
power bar
allows connection
of various electrical devices (AC-PWBE)
A
notch
located at the back of the adjustable shelf
allows cable passage inside the credenza
The upper panel allows for cable passage (hidden) to floor level
The panel has a 1¾" to 2" clearance from the wall.
RECOMMENDATION
Use a power bar to facilitate
plugging/unplugging of electrical devices.
POWER BAR
Содержание conference
Страница 1: ...conference Installation Guide February 2013...
Страница 4: ...1 BASES Conference Installation Guide February 2013...
Страница 13: ...2 SURFACES Conference Installation Guide February 2013...
Страница 17: ...3 ELECTRICITY AND CABLE MANAGEMENT Conference Installation Guide February 2013...
Страница 22: ...4 STORAGE Conference Installation Guide February 2013...
Страница 26: ...5 PRESENTATION BOARD Conference Installation Guide February 2013...
Страница 28: ...6 WORK WALLS Conference Installation Guide February 2013...