ARS RECYCLING SYSTEMS
DC Manual 20190729
Page | 15
Electric Unit Machine Set Up
1.
Make sure unit is on firm level ground and that all support legs are extended.
2.
Connect any vacuum hoses and route them to where they are needed.
3.
Connect the proper size airline to the unit’s regulator/filter assembly. The supplied air must be
dry. Moisture laden air will contribute to clogged filters and greatly reduce their life span. The
regulator is preset from the factory and does not require adjustment. 75 psi max.
4.
Electrical requirements for the DC7E, DC12E and the DC 20E are as follows: A 460-volt, 3 phase,
4 wire, 60 Hz input with at least a 50-amp circuit breaker.
Electrical requirements for the DC 45E: 460-volt, 3 phase, 4 wire, 60 Hz input with at least a
300-amp circuit breaker service.
Connections are made at the disconnect inside the main control cabinet and should be done by a
qualified electrician.
After sufficient electrical connections are made, and both 20” hose connections are open along with a dry
air supply, you are ready to collect dust through the system.
Only qualified personnel should attempt the installation operation and maintenance of this
equipment. Do not touch electrical connections before power has been disconnected.
Electrical shock can cause serious or fatal injury. Be sure system is properly grounded before
applying power.