19
Six (6) holes align.
Two (2) holes align.
CHECK THAT ALL ASSEMBLED PARTS ARE
THE CORRECT LENGTH BEFORE CONTINUING
10713
10713
10713
10713
BUILD ONE (1) DOUBLE (MAIN) BEAM
You will need for this page:
Step 4: Continued
Overlap two (2)
Roof Beams
so that bottom slots align
but DO NOT INSERT BOLTS. Next, overlap two (2) more
Roof Beams
to form a second
Roof Beam Assembly
.
DO NOT INSERT BOLTS .
5
7
Insert four (4)
Sand Bolts
and
Nuts
into slots from
bottom. Set aside for use in Step 15.
6
Place both
Roof Beam Assemblies
back-to-back to
form a Double (Main) Beam. Insert ten (10)
Sand Bolts
and
Nuts
as shown below.
Place two (2) bolts thru slots
on each side of the Beam.
(QTY: 14)
Roof Beam
4
10713
End View of Double Beam
Finished Length
96 1/8” (244,2 cm)
6” (15,2 cm)
Overlap Length
19W
SB
8
Check that the fi nished length of the
assembly is 96 1/8” (244,2 cm).
Side of Beams with small
holes must face up.
Содержание DS108
Страница 46: ...ASSEMBLY NOTES 46A 46...
Страница 47: ...ASSEMBLY NOTES 47A 47...
Страница 48: ......