29
29AG
Step 9: Continued
Hanging the Doors:
After the Doors have been assembled, install hinges on one
(1) Door using fl athead Screws and Nuts. Use the image to
the left as a guide to proper hinge position. Next, position one
(1) Door in the doorway of the building and secure the hinges,
from top to bottom, to the Door Jamb,
but
do NOT fully tighten.
With all hinges in place, hold the Door in alignment and slowly
tighten the Bolts on the Door Jamb side of the hinge. Repeat
to hang the other Door.
FS
FS
Hinge
6
66609
(QTY: 36)
FS
You will need:
Swing the Doors carefully to check alignment. If Doors are
misaligned, slightly loosen the Bolts on the Door Jamb side of
the hinge and realign the Door. Fully tighten when done.
Slide Bolt may need adjustment
to align properly.
If Slide Bolt does not align properly, you may
need to insert plastic washers between the
door and the Slide Bolt to ensure proper
fi t. Adjust number of plastic washers until
desired fi t is reached.
IMPORTANT:
Once the building is fully assembled, measure across the door
opening and check that it is 98 1/4” (249,6 cm). If it is not, move the front walls in or out
slightly to match this dimension. This must be done
BEFORE
anchoring.
Содержание DKGA-A
Страница 30: ...ASSEMBLY NOTES 46A 30...
Страница 31: ...ASSEMBLY NOTES 46A 31...
Страница 32: ......