18
18AG
Roof Install Prep Page
Read through all of Roof Assembly before beginning Step 6.
The building is square when diagonal measurements are equal.
Whenever a crimped rib and an uncrimped rib meet,
place the crimped rib UNDER the uncrimped rib.
Crimped Rib
Uncrimped Rib
At this time, take a moment to ensure
the building is level and square.
Measure the building diagonally again to make sure the building is
square. The building should be square at the base and at the top.
This will make Roof Panels fi t better and holes will better align.
IMPORTANT:
FASTEN TO WALL ANGLE WITH SCREWS
FASTEN TO ROOF BEAMS WITH SCREWS
FASTEN TO RIDGE CAP
FASTEN TO NEXT PANEL WITH BOLT AND NUT
FASTEN TO NEXT PANEL WITH SCREWS
Содержание DKGA-A
Страница 30: ...ASSEMBLY NOTES 46A 30...
Страница 31: ...ASSEMBLY NOTES 46A 31...
Страница 32: ......