All dimensions shown in mm unless otherwise stated.
i
i
Any cut lengths should be de-burred and touched up with touch-up paint supplied prior to installation.
For more information or further assistance, please contact us.
Installation Guide for
SWAGED & FLUSHJOINT
DOWNPIPE FIXING
We advise that you ensure the fi xing background is in good condition and will support the downpipe and that there are
suffi cient clips/brackets in place to secure the load.
When fi tting Colonnade downpipes, start from the outlet and work towards the gully. Make sure you have the right
combination of off sets/bends/branches and pipe to complete the installation.
Maximum fi xing centres is 2 metres – using correct stainless-steel fi xings and plugs for the substrate being fi tted to.
Ensure vertical alignment between drain
and gutter outlet.
Adjust the off set to suit the projection.
Place the off set in position from the outlet
and fi x the fi rst pipe into place, thus
holding the off set in position.
Sealant can be applied to the inside of the
pipe socket prior to installation. Swaged and
fl ushjoint downpipes should have sealant
applied to the socket prior to installation.
Cast Collared can be sealed after fi tment.
When fi tting fl ushjoint downpipe, sealant can
also be applied to the inside of the clip to
assist in supporting the pipe.
A pipe clip should be fi xed directly beneath
the pipe socket.
3
2
1
Additional pipe clips should be fi tted at 2m
maximum intervals.
Carry on installing pipes in this fashion
until reaching the drain. Clips to be fi xed
with plastic wall plugs and stainless steel
screws of a size suitable for the substrate.
A shoe, drain adaptor or off set may be
required to terminate the pipe work into the
gully
.
As per local building regulations, if a
shoe is not installed access pipes should
be fi tted and positioned to give suitable
rodding access as required.
4
5
6
2000mm
T: 0116 289 4400
|
E: sales@arp-ltd.com
|