Armstrong Steam QM-3 Скачать руководство пользователя страница 12

Armstrong International
IOM-246-V2.0
Steam QM-3 Calibration

Page 10 of 14

 

'

3

Calibrating the Condensate Flow Meter 

Calibration #6: Calibrating the Condensate Flow Meter  

 

1.  Locate the 6mm tube coming from 

D

P2 going inside the condensate vessel on top of EV2 and pull it out.

 

2.  Confirm the 6mm tube is cut on an angle.

 

3.  Replace tube back inside condensate vessel.

                    

 

4.  Ensure Steam QM-3 cabinet is level. 

 

5.  Locate the 6 mm tube coming out of the bottom of EV2.

 

6.  Follow the tube to the end and remove it where it connects to the tee on the condensate return line.  

 

    Place the end of the tube in the waste water vessel.

 

7.  Disconnect the 6mm tube from the inlet of EV2 (coming out of the NCG burette).  

 

8.  Place the 1 liter draw vessel filled with tap water on top of the Steam QM-3 so as to have good gravity flow.

 

9.  Connect the 6mm tube from the 1 liter draw vessel filled with tap water to the inlet to EV2.

 

10.  Position and level a calibrated balance (scale).

 

11.  Record the dry weight of a 500ml container.

 

12.  Turn on the power to the Steam QM-3. 

 

13.  Open the valve from the draw vessel (slowly) to establish a cycle rate of the EV2 valve of approximately 30 seconds.  

 

    One cycle is from opening to closure of valve, you should be able to hear this.. If the environment prohibits  

 

 

    hearing go to the control panel and press up and down arrows to access sensor menu and watch ∆P2 value. it will    

 

    climb from 0 to about 400 then when it opens it will drop back to 0.

 

14.  After the proper flow rate is established, let it cycle one more time and remove the tube from the waste container    

 

    (be careful not to shake out any remaining water from the tube). 

 

15.  Place the tube in the 500ml container (from step 11).

 

16.  Allow the EV2 valve to cycle exactly 20 times (keep track of the number of cycles).

 

17. After exactly 20 cycles remove the tube (be careful not to shake out any remaining water from the tube.

 

18.  Record the mass of the water and container together to nearest tenth of a gram, and calculate using the following    

 

    formula:  

(water + container) - the dry weight of container(step 11)

 

         

 

 

 20 = average mass of water per cycle

 

19.  On the Steam QM-3  display  pad  press  left  and  right  arrows  simultaneously  to  access  the  code  menu.                                                   

6mm tube from 

D

P2 

Condensate vessel

EV2

1 liter draw vessel

valve

6mm tube

500ml container

calibrated balance

Содержание Steam QM-3

Страница 1: ...auts Sarts 2 me avenue 4 4040 HERSTAL BELGIUM T l 32 0 4 240 90 90 Fax 32 0 4 240 40 33 armstronginternational com Keep this manual with equipment for future reference STEAM QM 3 Steam Quality Monitor...

Страница 2: ...ginternational com Armstrong Contents Revision History 1 Safety 2 Abbreviations and Acronyms 3 General Information 4 Recalibration Procedure 6 Calibrating the Temperature Sensors 6 Calibrating the Pre...

Страница 3: ...librated Page 6 Recalibration Procedure Section Point 3 has been added Remove the Temperature Sensor T1 after unplugging it and plug it back in before install it in oil bath Calibrating the Temperatur...

Страница 4: ...ualified person Installation should always be accompanied by competent technical assistance Improper installation start up operation maintenance or service may void warranty You are encouraged to cont...

Страница 5: ...seconds DIN Deutsches Institut f r Normung eV dP Differential Pressure EC European Community EEC European Electrotechnical Commission EN European Norm EV Electronic Valve F Fahrenheit gal Gallon h Hou...

Страница 6: ...nsors in the oil bath and recreate the actual temperatures for calibration This method is not covered in this document Pressure transmitter The pressure sensor is calibrated by simulating the voltage...

Страница 7: ...ibrated on the Steam QM 3 The instruments are 3 temperature sensors 1 pressure transmitter 1 heating element 1 condensate flow meter 1 gas flow meter NCG meter 2 differential pressure sensors Heating...

Страница 8: ...4 If not you must adjust the sensor 11 On the Steam QM 3 display pad press left and right arrows simultaneously to access the code menu 12 Enter 234 using the up and down arrows to change numbers and...

Страница 9: ...edure in step 1 for T3 Temperature sensor NOTE Any corrections to the calibration certificate must be done following good documentation practices The error is crossed through by a single line The corr...

Страница 10: ...the Steam QM 3 display pad press up and down arrows simultaneously to access the Debug sensor menu 7 Write the value of P1 on the calibration certificate If P1 is 0 1 bar regarding the set point 0 bar...

Страница 11: ...d press left and right arrows simultaneously to access the code menu 7 To access the resistance calibration menu enter 069 using the up and down arrows to change numbers and the left and right arrows...

Страница 12: ...alve from the draw vessel slowly to establish a cycle rate of the EV2 valve of approximately 30 seconds One cycle is from opening to closure of valve you should be able to hear this If the environment...

Страница 13: ...ertificate NOTE Any corrections to the calibration certificate must be done following good documentation practices The error is crossed through by a single line The correction is written alongside wit...

Страница 14: ...r syringe before resetting to 2ml 8 With the NCG injector syringe disconnected reset the syringe to 2ml 9 Connect the NCG injector syringe to the middle of the NCG injector assembly tee with a 6mm tub...

Страница 15: ...w sensor calibration menu 24 On the Steam QM 3 display pad press left and right arrows simultaneously to access the code menu 25 To access the flow sensor calibration menu enter code 123 using the up...

Страница 16: ...er draw vessel connecting to the bottom of the NCG burette use two wrenches 10mm and 11mm to ensure no damage to the NCG burette occurs Reconnect the expansion coil to the bottom of the NCG burette us...

Отзывы: