North America • Latin America • India • Europe / Middle East / Africa • China • Pacific Rim
armstrong
international.com
Designs, materials, weights and performance ratings are approximate and subject to change without notice. Visit
armstrong
international.com for up-to-date information.
41
Steam Generator Maintenance
The steam generator is basically the only part of the EHU that requires regular maintenance. This maintenance may include
cleaning or replacing the tank itself or the electrodes. We recommend substituting spare generator in order to minimize
downtime and labor requirements. The replaced generator may then be serviced when it is convenient.
No
Part Description
1
Barrier Tank
2
Ret Barrier Tank
3-4
Steam Generator Half
5
SCR Drain EHU
6
Tank Electrodes EHU
7
Nut Hex Jam 1/2-20 Brass